January 28, 2025St Leonards: drainage and external repairsThe St Leonards project brought together drainage access, local excavation, surface preparation and paving repairs around an established building.
January 20, 2025St Peter’s, Kids Inspire: building remedial worksThe St Peter's, Kids Inspire record covers local building defects around windows, an external wall vent and an internal service area.
January 16, 2025Stanmore House: boundary wall reconstructionAt Stanmore House, boundary wall reconstruction was carried out around retained metal railings beside a pavement.
January 1, 2025Stansted Mountfitchet: drainage investigation and reinstatementThe Stansted Mountfitchet investigation involved opening an existing surfaced area to trace below-ground water and drainage conditions.