September 24, 2025Knuttmill: excavation and concrete base constructionAt Knuttmill, excavation into sloping ground created space for a reinforced concrete base below the surrounding level.
September 16, 2025Leigh-on-Sea: reinforced concrete floor constructionThe Leigh-on-Sea project records a reinforced concrete floor being formed and poured above the surrounding street level.
September 6, 2025Leverton Hall: pothole and surface repairsThe Leverton Hall surface-repair record documents potholes, cracking and previous patches within an existing paved area.
August 31, 2025Lift shaft construction: reinforced concrete at heightThis reinforced concrete lift shaft is one of the most striking construction sequences in the CJC archive.