July 16, 2025Norwich, Rosary Road: structural concrete detailsThe Rosary Road project in Norwich records structural concrete details within a very narrow space beside an existing building and boundary.
July 10, 2025Mullions: rubbish clearance around a footpathAt The Mullions, the clearance record shows dumped waste along a surfaced route and within the vegetation beside it.
June 27, 2025Tyttenhanger House: external groundworks and landscapingThe Tyttenhanger House external works transformed prepared ground into defined landscaped and surfaced areas within an established walled setting.
June 20, 2025Structural remedial work: concrete wall junctionsThis structural remedial-work record concentrates on a concrete wall junction within a tightly enclosed construction area.