CJC CONTRACTS · 25 MILES FROM OUR YARD
Groundworks in Chelmsford
Chelmsford's clay, gravel and rivers. Groundworks planned around them.
CJC Contracts carries out groundworks in Chelmsford for developers, main contractors, schools, healthcare clients and self-builders: excavation, foundations, ground beams, slabs, drainage and external works. Our base at Great Horkesley is a drive of about 25 miles, and nearby published jobs include foundations at High Chelmer and external concrete at Hanningfield.
Established 2007 · Domestic & commercial construction

GROUNDWORKS IN CHELMSFORD
Below-ground work for Chelmsford's clay, gravels and floodplains
We take on groundworks in Chelmsford as a standalone package or as the first stage of a larger build: setting out and bulk excavation, foundations, ground beams and slabs, then drainage, kerbs and paving. Work follows your engineer’s drawings and the site investigation, and since we also form concrete frames and power-float floors, one contractor can carry the job up from formation level. CJC Contracts is fully insured, and works from a yard at Great Horkesley, about 25 miles away.
British Geological Survey mapping puts London Clay under nearly all of the city, but what lies on top changes within a mile or two. Head deposits of mixed clay, sand and gravel cover the centre, Moulsham, the West End and Springfield Green; alluvium follows the Chelmer; glacial till caps parts of Broomfield, Melbourne and Beaulieu; and sand and gravel underlie parts of Great Baddow and Danbury. To the south, the council’s flood study records Bagshot Formation around Stock and Galleywood, ringed by Claygate Member, on hills of about 85 to 95 metres above sea level.
Published work nearby shows the range. At High Chelmer, close to the city centre, new foundations were cast in concrete within an existing structural setting. About five miles south, the Hanningfield package was a substantial piece of external concrete and groundworks, with long access routes and turning areas to form. At Ingatestone, just over the Brentwood boundary, our below-ground concrete had to be coordinated with substantial structural steelwork. For extensions, refurbishment and other building work in the city, see our Chelmsford builders page.
GROUNDWORKS
Groundworks packages for Chelmsford sites
Foundations to the design
Raft, pad, strip or trench-fill foundations as your engineer designs them, taken down through head and London Clay to the depth that the site investigation, nearby trees and building control require.
Foundations to the designFoul and surface-water drainage
New foul and surface-water runs, chambers, soakaways where testing allows, and below-ground attenuation, built to the approved drainage strategy and the connection terms confirmed with the designer and Anglian Water.
Foul and surface-water drainageGround beams and slabs
Reinforced ground beams and ground-bearing or suspended slabs, with the formwork, reinforcement fixing and membranes they need, ready for the frame, steel or masonry that follows.
Ground beams and slabsSite preparation and bulk digs
Setting out, site clearance and topsoil stripping, then bulk and reduced-level excavation, cut and fill and working platforms, with spoil handling planned for clay that softens in wet weather and loose gravels that may need support.
Site preparation and bulk digsConcrete frames and floors
Reinforced concrete frames, retaining walls and power-floated floors for schools, healthcare, commercial and residential buildings, so the structure can rise straight from the substructure we have built.
Concrete frames and floorsKerbs, paving and external works
Access roads, car parks, kerbs, paths and hard landscaping, plus surface reinstatement after drainage work, for new developments and for facilities managers looking after existing estates.
Kerbs, paving and external worksFROM THE PROJECT ARCHIVE
Our groundworks in Chelmsford
Below-ground work, foundations and concrete from our published projects. These are in and around Chelmsford.

Chelmsford
High Chelmer, Chelmsford: concrete foundations
New concrete foundations formed within an existing structural setting at High Chelmer.
Read the project story
Hanningfield · 6 miles from Chelmsford
Hanningfield: large-scale concrete groundworks
A substantial external concrete and groundworks package with long access routes and turning areas.
Read the project story
Ingatestone · 6 miles from Chelmsford
Ingatestone: below-ground concrete and structural steel
Below-ground concrete construction coordinated with substantial structural steelwork.
Read the project storyBEFORE YOU START
Groundworks in Chelmsford: what to check
What the geological maps show
Point checks on the British Geological Survey’s 1:50,000 mapping return London Clay bedrock almost everywhere in and around Chelmsford, with Claygate Member at Galleywood and Ingatestone and Bagshot sand at Stock. The cover above it varies: head over the centre and Writtle, alluvium beside the Chelmer, Lowestoft Formation till around Broomfield and Beaulieu, and sand and gravel at Great Baddow and Danbury. The council’s contaminated land strategy adds that the London Clay overlies chalk, a major aquifer, and that glacial sand, gravel and brickearth extend across most of the area.
Policy DM18 and surface water
Policy DM18 of Chelmsford’s adopted Local Plan makes SuDS the principal way for major development to manage surface water, and allows surface water into the public sewer only where there is no feasible alternative. Essex County Council, as Lead Local Flood Authority, expects infiltration tested to BRE365, a minimum rate of 1×10⁻⁶ m/s, soakaways kept 5 metres or more from buildings, and a soakaway base at least 1 metre above the highest groundwater. A 2014 surface water management plan identified 12 Critical Drainage Areas in and around the city, and national guidance asks for a flood risk assessment in Flood Zone 1 on sites of a hectare or more, or where the flood map shows surface water risk.
Anglian Water: connections, adoption, build-over
Anglian Water manages the sewer network across the council area. Section 106 of the Water Industry Act 1991 lets owners connect drains to a public sewer after notifying the undertaker, which can refuse within 21 days if the drain falls short of its reasonable standards or would be prejudicial to its network. Section 104 covers agreements for the undertaker to adopt new sewers on completion. Anglian’s standard criteria apply to building near or over its sewers, and failing any one means an application. The council’s flood study notes that surface water sewers built from 1980 onwards are designed for a storm with a 1 in 30 annual chance, so bigger storms can overwhelm them.
Flood risk and contaminated ground
River flood risk is highest in the city centre, where the Can meets the Chelmer, according to the council’s flood study, and the flat land downstream towards Boreham is also exposed. Any scheme in Flood Zone 2 or 3 must come with a site-specific flood risk assessment. On land with a history of industrial use, the council’s contaminated land strategy makes the developer responsible for site investigation and remediation, secured through planning conditions, and Local Plan Policy DM30 protects groundwater and surface water. The strategy notes that many large factories in the area have closed, leaving land that may contain contamination.
Checked October 2026 from council, water company and government sources. Rules and services change, so confirm the details for your address before you start.
AREAS COVERED
Chelmsford and around
Send us the postcode and we’ll confirm. Places we cover from Chelmsford include:
- Springfield
- Beaulieu
- Channels
- Broomfield
- Great Leighs
- Boreham
- Danbury
- Bicknacre
- East Hanningfield
- West Hanningfield
- South Woodham Ferrers
- Rettendon
- Galleywood
- Writtle
- Margaretting
RELATED PAGES
HOW A PROJECT RUNS
From first call to handover.
- 01
Talk it through
Tell us what you want to build, where it is and what drawings or approvals you already have.
- 02
Visit and price
We look at the site, the access and the ground, then price the work from the drawings and specification.
- 03
Plan the build
We agree the programme, deliveries and any inspections, and who does what where other trades are involved.
- 04
Build and hand over
We run the work through to completion, with building control inspections at the stages the job needs them.
YOUR QUESTIONS
Groundworks in Chelmsford: common questions.
Can’t see your question? Call us on 01206 273689.
Is Chelmsford within your working area?
Yes. Chelmsford sits about 25 miles by road from our Great Horkesley yard, and our working area spans Essex, Suffolk and the outskirts of London. Published groundworks close to the city include foundations at High Chelmer, the external concrete package at Hanningfield, and the Ingatestone job, where below-ground concrete was coordinated with structural steelwork.
Can surface water go into the ground rather than a sewer?
Sometimes. Clay-rich ground sheds water quickly, but the sand and gravel mapped at places like Great Baddow and Danbury may drain better, and only testing will tell. Essex County Council expects BRE365 tests at the proposed soakaway, and anything slower than 1×10⁻⁶ m/s does not count as viable infiltration. Where infiltration fails, surface water is normally stored in attenuation and released at a restricted rate, and Chelmsford’s Local Plan treats a public sewer connection as the last option.
Do you build the concrete frame as well as the groundworks?
Yes. Alongside excavation, foundations, ground beams, slabs and drainage, we carry out reinforced concrete frames, formwork and reinforcement, and power floating. On a Chelmsford scheme that lets one contractor take the work from formation level to a finished floor or frame, with fewer handovers between trades. We work to the structural engineer’s drawings and coordinate with steelwork where the design mixes the two, as at Ingatestone.
What should we allow for near the rivers or on former industrial land?
Near the Chelmer, Can and Wid, allow for soft alluvial ground and a site-specific flood risk assessment if the site is in Flood Zone 2 or 3. On land with an industrial past, the council expects the developer to investigate and remediate any contamination, usually through planning conditions. We build to the approved remediation and drainage design and report anything unexpected found during excavation straight away.
How do you price groundworks in Chelmsford?
We need the drawings, the site investigation and a look at the site. Beyond that, cost follows formation depth and how the clay, head or gravel behaves, tree influence, groundwater, the volume of spoil to remove, drainage and attenuation, temporary works next to existing structures, and access on a busy urban site. We don’t work from a square-metre rate, and the more complete the tender information, the firmer the price.
START WITH THE BRIEF
Groundworks in Chelmsford? Send us the drawings.
Send us the site postcode, a short description of the work and any drawings you have. We’ll come back to you to talk it through and arrange a site visit where it’s needed.
CJC Contracts Ltd · The Mullions, Nayland Road, Great Horkesley, Colchester CO6 4HH
Request a no-obligation quotation
Fields marked * are required.
We’ll use your details to respond to your enquiry.
