CJC CONTRACTS · 38 MILES FROM OUR YARD

Groundworks in Brentwood

Every Brentwood site digs differently. We plan for it.

From digging and foundations to slabs, ground beams, external concrete and drainage, we deliver groundworks in Brentwood for developers, main contractors, schools and self-builders. Our published jobs here include new concrete steps between red-brick buildings in the town, and we work from Great Horkesley, around 38 miles away by road.

Established 2007 · Domestic & commercial construction

Brentwood: concrete steps and external groundwork
Brentwood: concrete steps and external groundwork
Since 2007Established38 milesFrom our yard by roadGreat HorkesleyOur yard, Colchester CO6Health & safetyLed by NEBOSH-qualified Les Charlesworth

BELOW GROUND IN BRENTWOOD

Groundworks on a sand ridge over London Clay

Brentwood is built along a ridge, which is why ground conditions change so quickly across the borough. British Geological Survey maps show the town centre, Warley, Pilgrims Hatch and Kelvedon Hatch on Bagshot Formation sand, often under a cap of flint-rich Stanmore Gravel. Shenfield, Ingrave and Ingatestone stand on the Claygate Member, while Brook Street and West Horndon drop onto London Clay. Planning groundworks in Brentwood therefore starts with the site investigation, which settles dig depths, trench support and whether rain can drain into the ground.

Surface water is judged against Policy BE05 of the Local Plan. It ranks infiltration first in the drainage hierarchy, then attenuation and discharge to a watercourse, with a surface-water sewer as the last resort. Greenfield and major schemes, and any site in a Critical Drainage Area, must match greenfield runoff rates, and brownfield sites that cannot must cut runoff by at least 50%. The council’s flood study found high infiltration potential across much of the urban area but poor rates on London Clay, so testing settles the design.

Most of our published work around Brentwood is reinforced and structural concrete. One Brentwood job paired new concrete steps with a long concrete edge, both formed between red-brick buildings. At Brentwood School the package was structural, combining concrete, masonry and steel as the school building developed, and at Ingatestone our below-ground concrete went in alongside a substantial structural steel package. We carry full insurance, and more of our borough projects appear on our Brentwood builders page.

GROUNDWORKS

Groundwork packages we take on in Brentwood

Foundations

Foundations of whichever type the engineer specifies, from strip and trench-fill to pads and rafts. On Brentwood’s clays the investigation and any trees set the depth; in loose sand and gravel we plan trench support so faces hold until the pour.

Foundations

Drainage and SuDS

Foul and surface water pipework with chambers, plus soakaways or attenuation tanks, laid to the approved strategy. Because the Anglian Water and Thames Water boundary crosses the town, we confirm with your drainage engineer who owns the outfall before trenches open.

Drainage and SuDS

Slabs and power floating

Slabs on the ground or suspended, with membranes, insulation and mesh or bar reinforcement, finished by power float where the specification asks for a flat, durable floor. Joints and falls are set out to the drawings for schools, workshops and commercial units.

Slabs and power floating

Site preparation

Clearance, reduced dig, cut-and-fill earthworks, working platforms and temporary access. A single Brentwood plot can run from sandy ridge to clay slope, so spoil handling, stockpiles and wet-weather protection are planned before plant arrives.

Site preparation

Formwork and reinforced concrete

Shuttering, steel fixing and poured concrete for retaining walls, steps, stairs and structural elements. The Brentwood steps and concrete edging, and the structural concrete at Brentwood School, are published examples of this side of our work.

Formwork and reinforced concrete

External works and surfacing

Kerbs, footpaths, parking areas, paving and hard landscaping, using permeable surfaces wherever the drainage design allows. Brentwood’s Local Plan strongly resists impermeable paving, front gardens and driveways included, unless it is shown to be technically infeasible.

External works and surfacing

Our groundworks service

FROM THE PROJECT ARCHIVE

Our groundworks in Brentwood

Below-ground work, foundations and concrete from our published projects. These are in and around Brentwood.

See all our projects

BEFORE YOU START

Groundworks in Brentwood: what to check

Ridge sands, Claygate beds and London Clay

At 1:50,000 scale, the BGS map shows Bagshot Formation sand under the town centre, Warley, Pilgrims Hatch and Kelvedon Hatch, with Stanmore Gravel capping parts of the ridge; BGS describes that gravel as mostly flint and clayey near its base. The Claygate Member, grey clays passing up into thin layers of clay, silt and fine sand, underlies Shenfield, Ingatestone and Mountnessing. London Clay is the bedrock around Brook Street, Blackmore and West Horndon, with head deposits mapped at West Horndon, and chalky Lowestoft Formation till covers parts of Doddinghurst and Blackmore.

Policy BE05 and the Essex SuDS guide

Policy BE05 expects every development to include appropriate SuDS. Source control such as permeable paving or swales should keep rainfall up to 5mm on site, major and Critical Drainage Area schemes need a surface water drainage strategy, and any discharge to a public sewer needs evidence of capacity. Designers must have regard to the county council’s SuDS Design Guide for Essex. It calls for BRE 365 infiltration tests, keeps soakaways 5 metres or more from any building, with a base at least a metre above peak groundwater, and sets a minimum infiltration rate of 1×10⁻⁶ m/s.

Two sewerage undertakers in one borough

The council’s infrastructure delivery plan shows wastewater from the borough going to treatment works run by both Anglian Water and Thames Water, with Thames Water’s Brentwood works serving the town’s western side. Thames Water told the council’s 2018 water cycle study that parts of its catchment, including Pilgrims Hatch and Brook Street, have limited local capacity. A new connection to a public sewer is notified to whichever undertaker owns it, under the Water Industry Act 1991, and the adoption code recommends signing a section 104 agreement before any sewer meant for adoption is built.

Surface water hotspots and inspection stages

Brentwood’s strategic flood risk assessment finds river flooding limited and surface water the main risk, naming West Horndon, Ingatestone and Brentwood Town Centre as hotspots, with Critical Drainage Areas defined in the Surface Water Management Plan. It also reports no historic records of groundwater flooding in the borough. The council’s building control team inspects excavations before concrete goes in and drainage before backfilling, and wants bookings in before 4pm on the previous day; work covered without notice may have to be opened up again.

Checked October 2026 from council, water company and government sources. Rules and services change, so confirm the details for your address before you start.

AREAS COVERED

Brentwood and around

Send us the postcode and we’ll confirm. Places we cover from Brentwood include:

  • Warley
  • Brook Street
  • Pilgrims Hatch
  • Shenfield
  • Hutton
  • Ingrave
  • Herongate
  • West Horndon
  • Ingatestone
  • Mountnessing
  • Doddinghurst
  • Kelvedon Hatch
  • Blackmore

RELATED PAGES

HOW A PROJECT RUNS

From first call to handover.

  1. 01

    Talk it through

    Tell us what you want to build, where it is and what drawings or approvals you already have.

  2. 02

    Visit and price

    We look at the site, the access and the ground, then price the work from the drawings and specification.

  3. 03

    Plan the build

    We agree the programme, deliveries and any inspections, and who does what where other trades are involved.

  4. 04

    Build and hand over

    We run the work through to completion, with building control inspections at the stages the job needs them.

YOUR QUESTIONS

Groundworks in Brentwood: common questions.

Can’t see your question? Call us on 01206 273689.

Are groundworks in Brentwood within your working area?

Yes. By road, Brentwood is about 38 miles from Great Horkesley, close to the outer limit of where we normally go. Published work here includes concrete steps and edging in the town, the Brentwood School structural package and below-ground concrete with steel at Ingatestone. We price for developers, main contractors, schools, facilities managers and self-builders.

Will my site drain to Thames Water or Anglian Water?

It depends on the catchment, and in Brentwood the line runs through the town. The council’s infrastructure plan places Shenfield and Hutton with Anglian Water and Warley with Thames Water, but individual streets need checking against sewer records. The undertaker handles connection notices and sewer adoption, so we confirm the company and connection point with your drainage engineer before excavating.

Is a soakaway realistic on a Brentwood site?

Sometimes. The council’s flood study found high infiltration potential across much of the urban area, where sand and gravel cap the ridge, but London Clay typically drains poorly. Policy BE05 puts infiltration first, so trial pits and BRE 365 tests at the proposed depth decide it. If tests come in under the Essex minimum, expect attenuation with a restricted outflow instead.

Can you build the concrete structure as well as the groundworks?

Yes, where the package calls for it. At Brentwood School we delivered structural concrete, masonry and steelwork as the school building developed, while the Ingatestone job coordinated below-ground concrete with substantial structural steelwork. Reinforced concrete frames, formwork and steel fixing, and power-floated floors are also among our services, so the frame and slabs can be included alongside the substructure.

How is a Brentwood groundworks package priced?

Each package is priced individually from the drawings, ground investigation and time spent on site. Cost depends mostly on how deep formation is and what the ground is, whether loose sand or gravel needs trench support, how much spoil leaves site, what the drainage design involves, access on a tight town-centre plot and the inspection stages. We don’t quote figures online.

START WITH THE BRIEF

Groundworks in Brentwood? Send us the drawings.

Send us the site postcode, a short description of the work and any drawings you have. We’ll come back to you to talk it through and arrange a site visit where it’s needed.

01206 273689

CJC Contracts Ltd · The Mullions, Nayland Road, Great Horkesley, Colchester CO6 4HH

Request a no-obligation quotation

Fields marked * are required.

    We use your details to respond to your enquiry. Read our Privacy Policy. Please do not send sensitive personal information.

    We’ll use your details to respond to your enquiry.