CJC CONTRACTS · MINUTES FROM OUR YARD
Groundworks in Colchester
Below ground, done right. Ready for what follows.
CJC Contracts carries out excavation, foundations, ground beams, slabs, drainage and external works for developers, main contractors, facilities managers and self-builders across Colchester. Our yard at Great Horkesley is about 4 miles from the town centre, and our published work includes a live hospital site in the town.
Established 2007 · Domestic & commercial construction

GROUNDWORKS IN COLCHESTER
Substructure and drainage for Colchester sites of every size
Colchester’s ground changes over short distances. Beneath the whole town lie the clays, silts and sands of the Thames Group, which includes the London Clay; above them, BGS maps show Kesgrave sands and gravels across much of the centre, coversands to the west and north, head deposits around the hospital and river alluvium at the Hythe. We price and programme excavation, temporary support and foundations around what the site investigation actually shows, not a standard depth carried over from the last job.
Surface water is a design question as much as a construction one. Colchester’s Local Plan expects sustainable drainage on new residential and commercial development, car parks and hard standings, and asks major schemes to bring runoff back to the greenfield 1 in 1 year rate with an allowance for climate change. Essex County Council, the Lead Local Flood Authority, wants infiltration tested to BRE365 where soakaways are proposed. Where the clay will not take water, attenuation and controlled discharge take over, as with the below-ground attenuation tank we installed for Colchester Hospital’s surface-water drainage.
Our Colchester work shows the range. At the hospital we formed and concreted reinforced ground beams and large slab areas for a new ward while the site stayed live. At the Volvo garage on Severalls we built a reinforced workshop floor with a membrane inside, plus new drainage chambers and pipework outside. At the Hythe we formed reinforced concrete ground beams in a deep, narrow excavation beside retained ground. We are fully insured, and work with developers, main contractors, facilities managers and self-builders.
GROUNDWORKS SERVICES
Groundworks packages in Colchester
Foundations
Strip, trench-fill, pad and raft foundations to your engineer’s design, with depths set by the site investigation and any tree influence on the clay. We give building control notice ahead of each pour so inspections happen before concrete goes in.
FoundationsDrainage
Foul and surface-water drainage, chambers, soakaways and attenuation, laid to falls and tested. Connections to Anglian Water’s public sewers, and sewers intended for adoption, go through its approval processes under sections 106 and 104 of the Water Industry Act 1991.
DrainageSlabs & ground beams
Reinforced ground beams, ground-bearing and suspended slabs, membranes and insulation, including the formwork and reinforcement. Published Colchester examples include ward slabs at the hospital, a workshop floor at Severalls and ground beams in a deep excavation at the Hythe.
Slabs & ground beamsSite preparation
Site clearance, topsoil strip, reduced-level digs, cut and fill, temporary access, working platforms and setting out. On clay sites we plan spoil handling and protection of exposed formations from wet weather at the start, not once the rain arrives.
Site preparationConcrete frames
Reinforced concrete frames, retaining walls, basements, stairs and power-floated floors for commercial, education and healthcare buildings. Because frames, formwork and power floating sit alongside our groundworks, the structure can follow the substructure without a change of contractor.
Concrete framesExternal works
Kerbs, paving, car parks, paths, hard landscaping and surface reinstatement, plus remedial work to failed surfaces and drainage on occupied sites. Facilities managers can use us for planned and reactive external works as well as new build.
External worksFROM THE PROJECT ARCHIVE
Our work in Colchester
Photographs and write-ups from real CJC jobs. These are in and around Colchester.

Colchester
Colchester Hospital: groundworks for a new ward
Reinforced ground beams and large slab areas formed and concreted for a new ward on a live hospital site.
Read the project story
Colchester
Colchester Hospital: attenuation tank installation
Installation of a below-ground attenuation tank as part of the hospital's surface-water drainage.
Read the project story
Severalls, Colchester
Volvo garage, Severalls: workshop floor and drainage
A reinforced workshop floor with membrane inside, plus new drainage chambers and pipework outside.
Read the project story
The Hythe, Colchester
The Hythe: concrete ground beams
Reinforced concrete ground beams formed in a deep, narrow excavation at The Hythe, Colchester.
Read the project storyBEFORE YOU BUILD
Building in Colchester: what to check
Ground conditions across Colchester
BGS 1:50,000 mapping puts Thames Group clays, silts and sands under the whole town; around Lexden, Prettygate, Shrub End and Stanway the mapped bedrock is the London Clay Formation itself, under coversands. The centre and Old Heath sit on Kesgrave sands and gravels, Highwoods, Mile End and Severalls on coversands, and the Hythe on alluvial clay and silt over Thanet and Lambeth Group strata. BGS notes that clay shrink-swell usually acts in the top 1.5 to 2 metres but can reach 5 metres where tree roots are present, which is why tree surveys and site investigation should come before foundation design.
SuDS, infiltration and the Lead Local Flood Authority
Policy DM24 of Colchester’s Local Plan expects SuDS on new residential and commercial development, car parks and hard standings, designed to Essex County Council’s SuDS Design Guide. Policy DM23 asks developments that add impermeable area, other than house extensions under 50 square metres, to include at least one source-control measure, and sites in the Critical Drainage Areas of the Colchester Surface Water Management Plan to seek greenfield runoff rates. The Essex guide requires BRE365 infiltration testing, a soakaway base at least 1 metre above the highest groundwater, soakaways at least 5 metres from buildings, and a minimum infiltration rate of 1×10-6 m/s.
Anglian Water: build-over, connections and adoption
Anglian Water, Colchester’s sewerage undertaker, asks to hear about anything built closer than 3 metres to a public sewer. Its build-over criteria cover pipe depth (under 3 metres), diameter (150mm or less), length beneath the building (6 metres at most) and manholes (none inside the footprint); anything outside them needs an application. Under section 106 of the Water Industry Act 1991, anyone connecting to a public sewer must give the undertaker notice, and it can refuse within 21 days if the drain’s construction or condition would harm its system. Sewers built for adoption are covered by a section 104 agreement.
The tidal Colne, the Hythe and flood risk
The Colne is tidal up to the East Mills control structure east of the town centre, and the Colne Barrier at Wivenhoe, 8 metres high and 130 metres wide, protects Colchester from tidal surges. The council’s flood study records tide-locking at surface-water outfalls in the Hythe, causing local flooding, and a history of flooding on Haven Road where it crosses Distillery Lane. The Environment Agency runs a flood warning area for the tidal Colne upstream of the barrier, including Colchester. On riverside sites, outfall levels, groundwater and excavation support all need thought before work starts.
Checked October 2026 from council, water company and government sources. Rules and services change, so confirm the details for your address with the council before you start.
AREAS COVERED
Colchester and around
Send us the postcode and we’ll confirm. Places we cover from Colchester include:
- Severalls
- The Hythe
- Stanway
- Tollgate
- Northern Gateway
- Mile End
- Myland
- Highwoods
- Greenstead
- Lexden
- Shrub End
- Old Heath
- Braiswick
- Marks Tey
- Copford
- West Bergholt
NEARBY AREA PAGES
HOW A PROJECT RUNS
From first call to handover.
- 01
Talk it through
Tell us what you want to build, where it is and what drawings or approvals you already have.
- 02
Visit and price
We look at the site, the access and the ground, then price the work from the drawings and specification.
- 03
Plan the build
We agree the programme, deliveries and any inspections, and who does what where other trades are involved.
- 04
Build and hand over
We run the work through to completion, with building control inspections at the stages the job needs them.
YOUR QUESTIONS
Building in Colchester: common questions.
Can’t see your question? Call us on 01206 273689.
Do you take on groundworks packages across Colchester?
Yes. Our yard at Great Horkesley is about 4 miles from Colchester town centre, and our published work in the town includes a new ward and an attenuation tank at Colchester Hospital, a workshop floor and drainage at Severalls and deep ground beams at the Hythe. We work for developers, main contractors, facilities managers and self-builders.
Can you work safely on a live hospital or school site?
We have done so in Colchester. For a new ward at the hospital we formed and concreted reinforced ground beams and slabs while the site stayed in use, and we installed a below-ground attenuation tank for its surface-water drainage. We plan access, segregation and deliveries with the client’s estates team before work starts.
Will soakaways work on my Colchester site?
It depends where the site is. Colchester’s strategic flood risk assessment says the London Clay limits infiltration, but parts of the town sit on sands and gravels that may drain better. Essex County Council expects infiltration testing to BRE365 at the depth and location of the proposed soakaway. If rates are too slow, the drainage design moves to attenuation with a controlled discharge.
Who handles Anglian Water for new sewer connections?
Connecting to a public sewer needs notice to Anglian Water under section 106 of the Water Industry Act 1991, and sewers intended for adoption are built under a section 104 agreement with Anglian Water. Your drainage engineer usually prepares the technical submissions; we build to the approved drawings and work with the engineer on the information and inspections those approvals require.
How do you price a groundworks package?
We price from drawings, the site investigation and a site visit rather than a rate per square metre. The main drivers are formation depth and ground conditions, groundwater, spoil volumes and disposal, the drainage design and any attenuation, access and working space, temporary works beside existing structures, and the constraints of a live site. We do not publish prices.
START WITH THE BRIEF
Planning work in Colchester?
Send us the site postcode, a short description of the work and any drawings you have. We’ll come back to you to talk it through and arrange a site visit where it’s needed.
CJC Contracts Ltd · The Mullions, Nayland Road, Great Horkesley, Colchester CO6 4HH
Request a no-obligation quotation
Fields marked * are required.
We’ll use your details to respond to your enquiry.
