Do I Need Planning Permission for a Single Storey Rear Extension?
October 28, 2026Without planning permission, you can usually extend the back of a house in England by up to 3 metres with a single-storey extension, or 4 metres if the house is detached, under permitted development. Through the larger home extension prior approval process you can go up to 6 metres (8 metres for a detached house), and a two-storey rear extension is limited to 3 metres and must stay at least 7 metres from the rear boundary. Beyond those limits, or if your house has lost its permitted development rights, you need a householder planning application.
Those headline numbers are where most people stop reading, and it’s where most mistakes start. How the depth is measured, what counts as the “original” house and whether earlier extensions eat into your allowance all decide how far you can really build. This guide covers each one.
How far can a single-storey rear extension go?
Single-storey rear extensions are covered by Class A of Part 1 of the General Permitted Development Order (GPDO). The limits set out by the Planning Portal are:
- Detached house: up to 4 metres beyond the rear wall of the original house.
- Semi-detached or terraced house: up to 3 metres.
- Height: no more than 4 metres overall.
- Near a boundary: if any part is within 2 metres of a boundary, the eaves can be no higher than 3 metres.
- Materials: the outside must look similar to the existing house.
These rights only apply to houses. Flats and maisonettes don’t have them, so any extension to a flat needs planning permission.
Can I go further than 3 or 4 metres without full planning permission?
Yes, through the larger home extension scheme, a prior approval route that has been permanent since 2019. It lets a single-storey rear extension project up to 6 metres from the original rear wall of a semi or terrace, or 8 metres from a detached house, with the same 4-metre height limit.
Before you start, you send the council a description of the work, a plan and the addresses of adjoining properties. The council notifies the neighbours, who get at least 21 days to comment. If nobody objects, the council doesn’t assess the impact on neighbours; if someone does, it decides whether the extension would harm their amenity. You can build once the council confirms prior approval isn’t needed or grants it, or if 42 days pass without a decision. The fee in England has been £249 since 1 April 2026.
This route isn’t available in conservation areas, National Landscapes, National Parks, the Broads, World Heritage Sites or Sites of Special Scientific Interest. We explain how prior approval sits alongside the other routes in permitted development vs planning permission.
How far can a two-storey rear extension go?
An extension of more than one storey at the back is much more restricted. Under Class A it must:
- extend no more than 3 metres beyond the rear wall of the original house, whatever the house type;
- be at least 7 metres from any boundary opposite the rear wall;
- have a roof pitch that matches the existing house as far as practicable;
- have any upper-floor side windows obscure-glazed and fixed shut, unless the opening part is more than 1.7 metres above the floor.
There’s no prior approval route to make a two-storey rear extension deeper. In a conservation area or other Article 2(3) land, any rear extension of more than one storey needs planning permission.
How do the limits compare?
| Type of rear extension | Detached house | Semi or terrace | Other key limits |
|---|---|---|---|
| Single storey (permitted development) | 4 m | 3 m | Max 4 m high; eaves max 3 m within 2 m of a boundary |
| Single storey (larger home extension prior approval) | 8 m | 6 m | Neighbours notified; not on Article 2(3) land or SSSI |
| Two storey or more (permitted development) | 3 m | 3 m | At least 7 m from the rear boundary; matching roof pitch |
| Anything bigger | Planning permission | Planning permission | Judged on local policy and neighbour impact |
How is the depth actually measured?
The government’s householder technical guidance says depth is measured from the base of the rear wall of the original house to the outer edge of the extension’s wall. Guttering and barge boards aren’t counted, but the thickness of the new wall is, so internal floor space ends up noticeably less than 3 or 4 metres.
Three details catch people out:
- The “original” house is the house as first built, or as it stood on 1 July 1948 if it’s older. If a previous owner added a rear extension, you measure from the original wall, not the back of that extension.
- Stepped rear walls each count as a rear wall. An extension that goes too far beyond any one of them needs planning permission.
- Height is measured from ground level next to the building. On a slope, that’s the highest point of the ground beside the wall, and decking doesn’t count as ground level.
Do previous extensions reduce how far I can build?
Yes. The technical guidance is clear that the limits apply to the total enlargement of the original house. If your semi already has a 2-metre rear extension, you have 1 metre of permitted development depth left at the back, not another 3.
Separately, extensions and outbuildings together can’t cover more than half the land around the original house. Garages, sheds and summerhouses all count towards that 50 per cent, so a large garden building can limit a rear extension even when the depth is fine. Our guide to permitted development covers the other conditions.
When will I need planning permission whatever the size?
Permitted development can be removed or restricted, in which case even a modest rear extension needs an application. Check for:
- Article 4 directions, which councils use to withdraw permitted development rights in particular areas.
- Planning conditions on the original permission for your house. Some estates have a condition removing householder permitted development rights.
- Listed buildings, which also need listed building consent for most extensions.
- Designated land such as conservation areas, where side extensions, cladding and two-storey rear extensions aren’t permitted development.
To be certain before you build, you can apply for a Lawful Development Certificate for a proposed use. It’s optional, but it gives you formal confirmation from the council that the extension is lawful, which helps when you sell.
What does this mean in Colchester, Essex and Suffolk?
The national limits apply across Essex and Suffolk, but local restrictions vary by street. Colchester City Council, for example, has an Article 4 direction in the Mill Field Estate Conservation Area that means residents need planning permission to extend or alter a house. Many villages across north Essex and Suffolk are also conservation areas, where the larger home extension route isn’t available. Check with your district council (such as Colchester, Braintree, Tendring, or Babergh and Mid Suffolk) before you design to the maximum.
Frequently asked questions
Can I build a 6-metre extension on a semi-detached house without planning permission?
Yes, if it’s single storey, no higher than 4 metres, and you get prior approval through the larger home extension scheme first. It isn’t available on Article 2(3) land or a Site of Special Scientific Interest.
Does a conservatory count towards the rear extension limits?
Yes. For planning purposes a conservatory is an extension, so it counts towards depth, height and the 50 per cent coverage rule.
Do I still need building regulations approval?
Almost always. Permitted development only covers planning. Most rear extensions need building regulations approval, and work near a shared boundary may also need a Party Wall Act notice to your neighbour.
How close to the boundary can I build a rear extension?
A single-storey extension can go up to the boundary, but if any part is within 2 metres of it the eaves can’t be higher than 3 metres. A two-storey rear extension must be at least 7 metres from the boundary opposite the rear wall.
Planning a rear extension in Essex or Suffolk?
CJC Contracts is a Colchester-based building and groundworks contractor, established in 2007 and based in Great Horkesley. We build house extensions across Essex and Suffolk, from foundations and groundworks through to the finished room. Every project needs a site-specific quote, so request a free quote or call 01206 273689.