November 6, 2026Your neighbour can refuse to consent to a party wall notice, but in most cases they can’t stop the work. Under the Party Wall etc. Act 1996, a refusal (or no reply within 14 days) simply means a dispute has arisen, and surveyors then decide how and when the work goes ahead in a document called a party wall award.
GOV.UK puts it plainly: neighbours “cannot stop lawful changes to your property”, but they can affect how and when the work is carried out. Here is what actually happens after a refusal, how long it takes and how to keep things friendly.
What does it mean when a neighbour refuses a party wall notice?
A “party wall agreement” is usually one of two things: your neighbour’s written consent to your notice, or a party wall award made by surveyors after a dispute. When you serve a notice, your neighbour (the “adjoining owner”) can:
- consent in writing;
- refuse consent, which starts the dispute process;
- serve a counter notice asking for extra works to be done at the same time (within one month of your notice).
Refusing consent isn’t the end of your project. It means the Act’s dispute procedure decides the details instead of an informal agreement between you. Silence counts the same way: GOV.UK says that failing to respond is not agreement and also starts dispute resolution.
What happens if your neighbour doesn’t reply within 14 days?
The Act treats no reply as dissent. For party structure notices (work to an existing party wall) and adjacent excavation notices, if the adjoining owner doesn’t give written consent within 14 days of the notice being served, they are treated as having dissented and a dispute is deemed to have arisen.
The notice periods still apply either way. The Act requires at least two months’ notice for work to an existing party wall, and at least one month for building a new wall on the boundary line or for excavating near your neighbour’s foundations.
| Type of work | Minimum notice | If no consent within 14 days |
|---|---|---|
| Work to an existing party wall (s.3), e.g. cutting in a steel beam | 2 months | Dispute deemed; surveyors appointed |
| Excavating within 3 m (or 6 m in some cases) of a neighbour’s building, below their foundation level (s.6) | 1 month | Dispute deemed; surveyors appointed |
| New wall astride the boundary line (s.1) | 1 month | You can only build the wall wholly on your own land |
Can a neighbour stop you building a wall on the boundary?
They can stop you building it astride the boundary, but not on your own land. Under section 1 of the Act, if your neighbour doesn’t consent within 14 days to a new wall straddling the line, you may build it only at your own expense as a wall placed wholly on your own land.
Even then, the Act lets you place projecting footings and foundations under your neighbour’s land, from one month after the notice and within 12 months of it. You must compensate them for any damage the wall or footings cause. This matters for extensions built right up to the boundary, where foundation design and groundworks need planning early.
How does the surveyor process work after a refusal?
Section 10 of the Act gives two options. Both owners can agree on one “agreed surveyor”, or each owner appoints their own surveyor. If there are two surveyors, they must select a third surveyor, who is called on if they can’t agree. Every appointment must be in writing and can’t be withdrawn.
The surveyors then make a party wall award. It can decide your right to carry out the work, when and how it is done, and other incidental matters, including who pays the costs of the award. RICS explains that the award usually also records the condition of the relevant part of your neighbour’s property before work starts, which protects both sides if damage is alleged later.
Surveyors must act impartially, whoever appoints them. RICS notes that once appointed, a surveyor can’t be removed by the owner who appointed them. You also can’t act as your own surveyor.
What if your neighbour refuses to appoint a surveyor?
The Act has a built-in answer. If a party refuses to appoint a surveyor, or fails to do so for 10 days after a written request, the other party can appoint one on their behalf. If a surveyor refuses or neglects to act for 10 days after a request, the other side’s surveyor can act alone.
So a neighbour who ignores letters or refuses to engage can delay a project by weeks, but can’t block it indefinitely. The real risk is to your programme: you generally need an award (or written consent) in place before starting the notifiable work.
Who pays when the neighbour refuses?
Usually you do, as the building owner. RICS says the building owner generally pays the surveyors’ fees and reasonable costs, including the adjoining owner’s surveyor. Costs can be shared in some cases, such as repairs to a defective shared wall, and an adjoining owner who acts unreasonably, for example by making excessive demands, may be liable for extra costs.
Your neighbour can also ask for security for expenses under section 12: money set aside before work starts. If the amount is disputed, the surveyors decide it. You also have to protect their property and fix or pay for any damage the work causes.
Can your neighbour appeal a party wall award?
Yes, but only within a short window. Either owner can appeal to the county court within 14 days of being served with the award. The court can rescind or modify the award and make an order on costs. Otherwise, the Act says the award is conclusive.
How can you avoid a refusal in the first place?
Most refusals come from worry, not hostility. RICS advises talking to your neighbours in detail about the work before giving written notice, because resolving concerns early can mean they consent and the surveyor process is avoided. Practical steps that help:
- show them the drawings and explain what will happen at the shared wall or boundary;
- serve notice early: it can be served up to a year ahead, and a two-month wait can easily hold up a start date;
- offer to photograph or record the condition of their side before work begins;
- explain working hours, access and how dust and noise will be managed.
Party wall matters are separate from planning permission and building regulations. You may need all three for a rear extension; our guide to building regulations for an extension covers the regulations side.
Frequently asked questions
Can my neighbour stop my extension by refusing a party wall agreement?
No. A refusal starts the surveyor process under the Act. The award sets out how and when the work is done, but your neighbour can’t use the Act to stop lawful work.
Is no reply the same as consent?
No. If your neighbour doesn’t consent in writing within 14 days, they are treated as having dissented and a dispute is deemed to have arisen.
Can we use one surveyor for both of us?
Yes. Both owners can appoint a single “agreed surveyor”, who must act impartially. RICS notes this can reduce costs.
Does my neighbour have to let workers onto their land?
Where the work is authorised under the Act, neighbours must allow surveyors and workers access during usual working hours, with 14 days’ notice except in an emergency.
Building near a boundary in Essex or Suffolk?
CJC Contracts is a Colchester-based building and groundworks contractor, established in 2007 and based in Great Horkesley, working across Essex and Suffolk. We build extensions, foundations and brickwork close to shared walls and boundaries, and we can work alongside your party wall surveyor. For a free quote, contact us online or call 01206 273689.