
Do I Need Planning Permission for a Single Storey Rear Extension?
October 28, 2026
How Much Can I Extend My House? The Size Limits Explained
October 29, 2026Sometimes. In England, a two-storey rear extension can be permitted development if it goes no more than 3 metres beyond the original rear wall, stays at least 7 metres from the boundary opposite that wall, matches the existing roof pitch and meets the other householder rules. A two-storey side extension, or any extension of more than one storey on a house in a conservation area, National Landscape or other designated land, always needs planning permission.
Because the conditions overlap, many two-storey designs fail on one detail, usually the distance to a boundary. Here’s how the rules work and how to check your own house.
What are the permitted development rules for a two-storey rear extension?
Extensions are permitted development under Class A of the General Permitted Development Order. According to the Planning Portal, an extension of more than one storey must meet all of these conditions:
- It goes no more than 3 metres beyond the rear wall of the original house. This applies to detached houses too; there is no 4-metre allowance above ground floor.
- It is not within 7 metres of any boundary opposite the rear wall of the house.
- The roof pitch matches the existing house as far as practicable. This also applies to an upper storey built on top of an existing extension.
- Any upper-floor window in a side elevation is obscure-glazed and non-opening, unless the opening part is more than 1.7 metres above the floor.
- It is no higher than the highest part of the existing roof, and its eaves are no higher than the existing eaves.
- Where any part comes within 2 metres of a boundary, the eaves are no higher than 3 metres.
- Together with other extensions and outbuildings, it covers no more than half the land around the original house, and it includes no balcony, veranda or raised platform.
- The outside materials look similar to the existing house.
Point 6 catches many people out. First-floor eaves are almost always higher than 3 metres, so in practice a two-storey extension within 2 metres of a side boundary won’t be permitted development. On a narrow semi-detached or terraced plot, that often rules it out on its own.
“Original house” means the house as first built, or as it stood on 1 July 1948 if it is older. Any earlier rear extension counts towards the 3 metres. Our guide to how far you can extend the back of your house explains how the depth is measured.
Why is a two-storey side extension never permitted development?
Under Class A, anything that extends beyond a side wall of the original house can only be a single storey, no more than 4 metres high and no wider than half the width of the original house. The Planning Portal states plainly that all side extensions of more than one storey need householder planning permission. The same applies to a wraparound design where the two-storey part sits to the side.
That doesn’t mean a two-storey side extension will be refused. Councils approve them regularly. It means the design is judged on its merits against the local plan and design guidance, including how it affects the street scene and the neighbours.
Can prior approval get me a bigger two-storey extension?
Not at the back. The larger home extension prior approval scheme, which allows 6 metres on a semi-detached or terraced house and 8 metres on a detached one, only covers single-storey rear extensions. Our guide on single-storey rear extensions covers how that scheme works.
There is a separate right, Class AA, for adding storeys on top of an existing house rather than extending outwards. Under the 2020 amendment order, it applies only to houses built between 1 July 1948 and 28 October 2018 that haven’t already been extended upwards. A house of two or more storeys can gain up to two extra storeys, but a semi-detached or terraced house can only rise 3.5 metres above its neighbour or the highest roof in its row, which in practice means one. The house can’t end up more than 18 metres high, and there must be no windows in side elevations.
Class AA always needs prior approval. The council assesses the impact on neighbours (including overlooking, privacy and loss of light) and the external appearance, and you must submit a report on construction hours, noise, dust and traffic. Work must be finished within 3 years of approval, and you must tell the council when it is complete. Class AA isn’t available on Article 2(3) land or a Site of Special Scientific Interest.
When does a two-storey extension always need planning permission?
| Situation | Permitted development? |
|---|---|
| Rear, up to 3 m deep, 7 m+ from rear boundary, more than 2 m from side boundaries | Usually yes |
| Rear, deeper than 3 m | No – planning permission needed |
| Rear, within 7 m of the rear boundary | No – planning permission needed |
| Any two-storey side or wraparound extension | No – planning permission needed |
| Conservation area, National Landscape, National Park, the Broads or World Heritage Site | No – planning permission needed |
| Flat or maisonette | No – Class A only covers houses |
| Rights removed by condition or Article 4 direction | No – planning permission needed |
| Listed building | No – planning permission and listed building consent |
For the wider picture of what each route involves, see permitted development vs planning permission.
What else does a two-storey extension need?
Permitted development only answers the planning question. A two-storey extension will also need:
- Building regulations approval. Foundations, structure, fire safety, insulation, ventilation and drainage are checked by council building control or a registered building control approver.
- Structural design. A first floor adds load to the foundations and usually needs steel or engineered timber where it meets the existing house, so expect structural calculations.
- Party wall notices, where relevant. Under the Party Wall etc. Act 1996, you must notify neighbours before work on a shared wall, building on the boundary, or digging foundations near theirs.
If your design is close to the limits, a Lawful Development Certificate gives you the council’s written confirmation that it is permitted development. It isn’t compulsory, but it’s useful when you come to sell.
What should Essex and Suffolk homeowners check?
Designated land is common in this area. Parts of north Essex and south Suffolk fall within the Dedham Vale National Landscape, the Suffolk coast is covered by the Suffolk Coast and Heaths National Landscape, and many town centres and villages are conservation areas. On any of this land, every extension of more than one storey needs planning permission. Some councils have also used Article 4 directions; Colchester City Council’s covers house extensions in the Mill Field Estate Conservation Area.
Check your council’s conservation area and Article 4 maps, and the planning history of your house, before you pay for drawings.
Frequently asked questions
Can I build a two-storey extension on a semi-detached house without planning permission?
Only at the back, up to 3 metres deep, at least 7 metres from the rear boundary and more than 2 metres from side boundaries. On many semis the side boundary distance rules it out.
Can I add a second storey on top of my single-storey extension?
Possibly. The result must meet the two-storey rules, including the 3-metre depth and 7-metre boundary limits, and the roof pitch must match the house.
Does a detached house get a bigger two-storey allowance?
No. The 4-metre allowance for detached houses only applies to single-storey rear extensions. Two-storey rear extensions are limited to 3 metres on every type of house.
Can my neighbours object to a permitted development extension?
Not under Class A, because there is no application. They can object to a planning application or a prior approval, and party wall rights apply either way.
Planning a two-storey extension in Essex or Suffolk?
CJC Contracts is a Colchester-based building and groundworks contractor, established in 2007 and based in Great Horkesley, working across Essex and Suffolk. We build house extensions, from the foundations to the brickwork and roof. Every project needs a site-specific quote, so request a free quote or call 01206 273689.
Sources
- Planning Portal: Extensions – planning permission
- legislation.gov.uk: The Town and Country Planning (General Permitted Development) (England) (Amendment) (No. 2) Order 2020, Class AA
- GOV.UK: Permitted development rights for householders – technical guidance
- GOV.UK: Party walls and building work
- Colchester City Council: Mill Field Estate Conservation Area


