CJC CONTRACTS · GREAT HORKESLEY, COLCHESTER
Groundworks in Suffolk
Substructure first. The rest follows.
Working from Great Horkesley, right on the Essex–Suffolk border, CJC Contracts carries out groundworks in Suffolk for self-builders, schools, healthcare clients, developers and main contractors. Each package can take in excavation, foundations, ground beams, drainage, attenuation, power-floated slabs and external works, and Ipswich Hospital is among the sites we have worked on.
Established 2007 · Domestic & commercial construction

GROUNDWORKS ACROSS SUFFOLK
From chalk to crag: digging across Suffolk
We take on groundworks in Suffolk either as a standalone package or as one part of a wider build, working to the engineer’s drawings, the contractor’s programme and the rules of the site. The scope runs from setting out and excavation, through foundations to the engineer’s design, ground beams and slabs, below-ground drainage and attenuation, power floating and reinforced concrete frames, to the kerbs, paving and surfacing that finish a job. We carry full insurance.
The ground changes from west to east. BGS mapping puts chalk close beneath Bury St Edmunds, Mildenhall and Brandon and along parts of the Stour, Brett and Gipping valleys, Crag Group sands under much of central and eastern Suffolk, and boulder clay across High Suffolk. Clay and till drain slowly and move with the seasons; chalk and sand may accept infiltration but must pass testing first, and over chalk the county asks for soakaways to sit further from buildings. Excavation, groundwater control and drainage are planned around the site investigation.
In Suffolk itself, we prepared a reinforced concrete base for a cycle shelter at Ipswich Hospital. Our other examples lie a few miles over the border in Colchester and Great Horkesley: reinforced ground beams and large slab areas for a new ward on the live Colchester Hospital site, concrete for a radiation unit in a tight space between hospital buildings, a below-ground attenuation tank for the hospital’s surface-water drainage, the Severalls workshop floor and drainage, and a reinforced concrete basement at The Mullions.
GROUNDWORKS
What our Suffolk groundworks packages cover
Foundations and ground beams
Trench-fill, strip, pad and raft foundations and reinforced ground beams, all to the engineer’s design. On the live Colchester Hospital site, a new ward needed reinforced ground beams and large slab areas, which we formed and concreted.
Foundations and ground beamsDrainage and attenuation
Chambers, pipework, soakaways, attenuation tanks and flow controls for foul and surface water, built to the approved strategy. Colchester Hospital’s below-ground attenuation tank, which we installed, is part of that site’s surface-water drainage.
Drainage and attenuationSlabs and power floating
Power-floated ground-bearing and suspended slabs, with the membranes and reinforcement beneath, for workshops, schools and commercial units. The reinforced workshop floor at the Volvo garage, Severalls, has a membrane inside, with new chambers and pipework outside.
Slabs and power floatingSite preparation
Clearance, topsoil strip, bulk excavation, muck-away, earthworks and working platforms. Where the formation is clay or till, we protect it between excavation and concrete so rain and site traffic don’t soften it before the concrete goes in.
Site preparationBasements and concrete frames
Basements, retaining walls, columns and floors in reinforced concrete, including the formwork and steel fixing. The Mullions job in Great Horkesley was a reinforced concrete basement, completed before the building above it took shape.
Basements and concrete framesExternal works
Kerbs, paths, paving, car parks and hard landscaping for estates, schools and hospital sites, plus reinstatement after drainage or service trenches, so the site is handed back finished rather than patched.
External worksFROM THE PROJECT ARCHIVE
Groundworks projects across Suffolk
Below-ground work, foundations and concrete from our published projects. A selection from across the county and just over the border.

Ipswich
Ipswich Hospital: reinforced slab preparation
Preparation of a reinforced concrete base for a cycle shelter at Ipswich Hospital.
Read the project story
Great Horkesley
The Mullions: new-build basement construction
A reinforced concrete basement built before the new building above took shape, at The Mullions in Great Horkesley.
Read the project story
Severalls, Colchester
Volvo garage, Severalls: workshop floor and drainage
A reinforced workshop floor with membrane inside, plus new drainage chambers and pipework outside.
Read the project story
Colchester
Colchester Hospital: groundworks for a new ward
Reinforced ground beams and large slab areas formed and concreted for a new ward on a live hospital site.
Read the project story
Colchester
Colchester Hospital: radiation unit concrete works
Concrete construction for a radiation unit within a tightly defined space between existing hospital buildings.
Read the project story
Colchester
Colchester Hospital: attenuation tank installation
Installation of a below-ground attenuation tank as part of the hospital's surface-water drainage.
Read the project storyBEFORE YOU START
Groundworks in Suffolk: what to check
Suffolk County Council and surface water
Suffolk County Council acts as Lead Local Flood Authority, and planning authorities must consult it on surface water for major development, meaning 10 or more homes, 1,000 square metres or more of floorspace, or a site of at least 1 hectare. Smaller applications on land at risk of surface water flooding go to it too. Its 2023 SuDS guide ranks rainwater re-use first, then shallow infiltration, watercourses and sewers, prefers discharge limited to QBAR, asks brownfield sites for at least 30% betterment where greenfield rates can’t be met, and adds 10% for urban creep on housing.
Infiltration tests, chalk and stand-off distances
Under the Suffolk guide, infiltration is tested to BRE 365 in trial pits at the location and depth of the design, and needs at least 10 mm per hour if it is to be the only outlet. The base of a soakaway should normally be no more than 2 metres below existing ground, at least 1.2 metres above the highest groundwater level, and the soakaway at least 5 metres from structures and highways, or 10 to 20 metres over chalk. Direct discharge into chalk in groundwater source protection zones is discouraged. Where tests fail, attenuation with a controlled outfall takes over.
Ditches, culverts and land drainage consent
Any work in, over, under or near an ordinary watercourse needs Land Drainage Consent before it starts, and that consent is separate from planning permission. Suffolk County Council issues it outside Internal Drainage Board areas; inside them the board deals with it, and works on main rivers go to the Environment Agency. The council’s April 2026 culvert policy applies a strong presumption against culverting, prefers an open channel or single-span bridge, and points out that the law does not allow consent to be granted retrospectively, so site access crossings need programming early.
Anglian Water across the county
The councils’ water cycle studies name Anglian Water as the wastewater undertaker in every Suffolk district, although Essex & Suffolk Water supplies drinking water across the former Waveney district, around Framlingham, Saxmundham and Leiston, and in part of Mid Suffolk. Anglian assesses any building over or within 3 metres of one of its public sewers against eight standard criteria. A new connection needs notice under section 106 of the Water Industry Act 1991, giving the undertaker 21 days to refuse it if the drain’s construction or condition falls short of its reasonable standards or would prejudice its system; a section 104 agreement governs sewers that are to be adopted.
Checked October 2026 from council, water company and government sources. Rules and services change, so confirm the details for your address before you start.
AREAS COVERED
Suffolk and around
We work across the county from our yard near Colchester. Places we regularly cover include:
- Ipswich
- Felixstowe
- Woodbridge
- Martlesham
- Kesgrave
- Stowmarket
- Needham Market
- Sudbury
- Great Cornard
- Hadleigh
- Long Melford
- Capel St Mary
- Brantham
- Bury St Edmunds
- Haverhill
RELATED PAGES
HOW A PROJECT RUNS
From first call to handover.
- 01
Talk it through
Tell us what you want to build, where it is and what drawings or approvals you already have.
- 02
Visit and price
We look at the site, the access and the ground, then price the work from the drawings and specification.
- 03
Plan the build
We agree the programme, deliveries and any inspections, and who does what where other trades are involved.
- 04
Build and hand over
We run the work through to completion, with building control inspections at the stages the job needs them.
YOUR QUESTIONS
Groundworks in Suffolk: common questions.
Can’t see your question? Call us on 01206 273689.
Which parts of Suffolk do you cover for groundworks packages?
Most of the county is within reach. Our Great Horkesley yard is on the border, so south Suffolk is closest, with Hadleigh about 13 miles by road and Sudbury about 15. Ipswich is around 16 miles, Stowmarket and Felixstowe about 26, and Bury St Edmunds about 41. For a site in the far north, near Lowestoft or Beccles, send us the details first and we will say plainly whether it suits us.
Does Suffolk County Council have to approve our drainage design?
Not as a separate approval. Planning decisions, including drainage conditions, currently rest with the district or borough council, which takes the county council’s advice on major schemes and on smaller ones where surface water flooding is a risk. Anglian Water must agree any sewer connection, and work affecting a ditch or stream needs Land Drainage Consent. Once those are in place, we build to the approved drawings.
Can we culvert a ditch to form a site entrance?
Only with Land Drainage Consent, obtained before work starts, and Suffolk County Council applies a strong presumption against culverting. It considers a culvert only where there is a genuine need and no reasonable alternative, such as keeping the channel open or spanning it with a single-span bridge. Inside an Internal Drainage Board area the board handles consent instead. Build this into the programme, because retrospective consent isn’t available.
Have you worked on occupied hospital sites?
Yes. Colchester Hospital, just over the border, is where we formed and concreted the reinforced ground beams and slab areas for a new ward on a site that remained in use, built concrete for a radiation unit squeezed between existing buildings, and installed a below-ground attenuation tank. In Suffolk, we prepared a reinforced concrete base for a cycle shelter at Ipswich Hospital. More on our hospital work.
What drives the price of groundworks in Suffolk?
We price from the drawings, the ground investigation and a site visit, and don’t publish rates. The main variables are excavation depth and spoil volumes, how the ground behaves once opened up, groundwater, whether infiltration passes or attenuation is needed, outfall and culvert consents, reinforcement and concrete quantities, access for plant and deliveries, and phasing on an occupied site. Smaller domestic jobs are covered on our builders in Suffolk page.
START WITH THE BRIEF
Groundworks in Suffolk? Send us the drawings.
Send us the site postcode, a short description of the work and any drawings you have. We’ll come back to you to talk it through and arrange a site visit where it’s needed.
CJC Contracts Ltd · The Mullions, Nayland Road, Great Horkesley, Colchester CO6 4HH
Request a no-obligation quotation
Fields marked * are required.
We’ll use your details to respond to your enquiry.