PROJECT STORIES · FORMWORK AND REINFORCEMENT

The Mullions: new-build basement construction

From the CJC project archivePublished

Basement base reinforcement with projecting wall starter bars at The Mullions

The Mullions new-build project records the construction of a reinforced concrete basement before the building above takes shape. The sequence includes the excavated footprint, a dense base reinforcement grid, placed concrete and later wall construction, giving a clear view of the work that will eventually sit below the finished home.

Basement construction brings the groundworks and structural package into close contact. The excavation has to provide space for the permanent structure, while the base, walls and external protection need to be coordinated before access is reduced by the next stage.

Establishing the basement footprint

The early photographs show the reinforced base within a deep excavation, with the surrounding ground rising above the working level. The footprint is clearly defined, and vertical bars project around the perimeter to connect to the walls.

Before the base is poured, the formation, reinforcement and planned joints need to work as one assembly. Any drainage or service details passing through the construction also need to be resolved while they remain accessible. The concrete will make those positions permanent.

Reinforcement and the base pour

The exposed grid demonstrates the amount of preparation beneath the eventual floor surface. Reinforcement has to remain supported in its intended position, with continuity through the corners and wall connections.

The later base photograph shows the steel grid concealed by a regular concrete surface, while the perimeter bars remain exposed for the next stage. That contrast makes the sequence especially clear: the slab becomes a working platform and the starting point for the vertical structure above it.

Building and protecting the walls

Subsequent views show the wall construction rising around the lower-level space. One exterior photograph records a dark treatment on the below-ground face, with the working area still open outside it. The proprietary system is not identified, but the timing of the operation is important: accessible faces can be prepared before backfilling conceals them.

Basement water-management details depend on the project design and cannot be established from colour or appearance alone. The construction sequence nevertheless shows why those details need to be planned alongside the structure, particularly at joints and transitions between the base and walls.

Preparing for the building above

Later masonry photographs show the new build progressing beyond the earliest concrete stage. The levels and dimensions established below ground now become references for the walls and spaces above.

The basement sequence connects the early groundwork to the developing building envelope. Open reinforcement becomes a concrete base, the walls rise from their prepared connections, and the accuracy established below ground carries into the construction above.