CJC CONTRACTS · 46 MILES FROM OUR YARD
Groundworks in Harlow
Trial pit to finished slab. Planned around Harlow's clay.
We take on groundworks in Harlow for developers and main contractors, school, healthcare and facilities clients, and self-builders, covering excavation, foundations, slabs, drainage and external works. In the town we’ve cast concrete staircases, columns and the floors they carry in a building of several storeys, working from Great Horkesley about 46 miles away.
Established 2007 · Domestic & commercial construction

GROUNDWORKS ACROSS HARLOW
Groundwork for a new town that is growing again
Harlow’s Local Plan, adopted in December 2020, places the whole town inside the Harlow and Gilston Garden Town, with four new communities around its edge: Latton Priory to the south, the Water Lane area to the west, East of Harlow, and the Gilston area across the Stort in East Hertfordshire. With the district’s own sites, they are planned to provide 16,100 homes over the plan period. The Enterprise Zone at Templefields and London Road adds employment land, so groundworks in Harlow range from estate infrastructure to commercial plots and infill.
Much of the town is built on boulder clay. BGS maps show chalky Lowestoft Formation till over London Clay beneath the town centre, Mark Hall, Great Parndon and Newhall, with London Clay exposed around Church Langley, Latton Bush and Tye Green. Along the Stort the ground changes to river alluvium, and glacial sand and gravel is mapped in parts of Templefields and Kingsmoor. Harlow’s flood study describes most of the bedrock as low-permeability strata and insists on early infiltration testing at each site, so we wait for results before assuming a soakaway will work.
Our Harlow work runs from structure to below-ground repair. In a building of several storeys, still under construction, we cast the concrete staircases and columns and the floor slabs they hold up. At The Meadows we traced and fixed problems at drainage chambers, along service routes and where roof water is handled. At Longshaws in Waltham Abbey, about seven miles south-west, we laid a wide area of surfacing next to the building, with kerbed islands, footpaths and detailing around chambers. Our Harlow builders page covers extensions and repairs in the town.
GROUNDWORKS
Groundwork packages for Harlow sites
Foundations
Foundations of the engineer’s chosen type: trench-fill, strip, pads or a raft. On Harlow’s till and London Clay, the ground investigation and nearby trees govern depth, and trial pits show where clay gives way to gravel or river alluvium.
FoundationsSeparate foul and surface drainage
Foul and surface-water systems kept apart, as Harlow’s Local Plan requires, with chambers, attenuation and connections into Thames Water’s network. We also trace and repair faults in existing drainage, as we did around chambers and service routes at The Meadows.
Separate foul and surface drainageSlabs and power floating
Floor slabs, either ground-bearing or suspended, with membranes and reinforcement, power floated for warehouse, workshop and commercial use. Employment land at Templefields, the Pinnacles and London Road needs floors set out to the loads and falls the engineer specifies.
Slabs and power floatingEarthworks and site preparation
Clearance, topsoil strip, reduce digs, cut-and-fill and haul roads for estate and employment sites. Exposed clay formations need protecting from rain and site traffic, so spoil, stockpiles and wet-weather working are planned before plant is delivered.
Earthworks and site preparationConcrete frames and stairs
Reinforced concrete columns, staircases, suspended floors and frames where a building rises over several floors, formed and poured to the engineer’s drawings. Our Harlow staircase, column and floor job is a published example of this structural work.
Concrete frames and stairsExternal works and surfacing
Kerbs, paths, car parks and wide surfacing with chambers set to level, as on the Longshaws job in Waltham Abbey. Harlow’s plan supports SuDS in all development, retrofitting included, so permeable surfaces and swales can form part of the external works.
External works and surfacingFROM THE PROJECT ARCHIVE
Our groundworks in Harlow
Below-ground work, foundations and concrete from our published projects. These are in and around Harlow.

Harlow
Harlow: concrete stairs and structural floors
Concrete stairs, columns and supported floors in a multi-level building under construction.
Read the project story
Harlow
The Meadows, Harlow: drainage investigation and repairs
Investigation and repairs around drainage chambers, service routes and roof-water details.
Read the project story
Waltham Abbey · 7 miles from Harlow
Longshaws, Waltham Abbey: surfacing and drainage details
Broad external surfacing with chamber details, kerbed islands and paths beside the building.
Read the project storyBEFORE YOU START
Groundworks in Harlow: what to check
Boulder clay, London Clay and the Stort
The BGS 1:50k geology map has Lowestoft Formation till, which BGS defines by its chalk and flint content, lying over London Clay across much of Harlow. Around Church Langley, Latton Bush and Tye Green the London Clay itself reaches the surface, while at Old Harlow the till rests on older Thanet Formation and Lambeth Group strata. Alluvium follows the Stort valley and glacial sand and gravel is mapped at Templefields. The council’s flood study classes most of the district’s bedrock as unproductive, low-permeability strata, with only a small pocket of chalk aquifer in the north-east.
Policy PL11: separate systems and SuDS
Harlow Local Development Plan Policy PL11 requires surface and foul water systems to be kept separate, and proposals to show there is drainage and treatment capacity to serve them. Where SuDS are required they must use the most sustainable option in the hierarchy, meet the non-statutory technical standards for runoff, allow for climate change in attenuation and set out future maintenance, with major schemes following Essex County Council’s standards as Lead Local Flood Authority. Development in one of the 13 Critical Drainage Areas identified in Harlow’s 2013 surface water management plan may have to contribute towards flood alleviation schemes.
Thames Water and Rye Meads
All of Harlow’s wastewater, and that of the wider Garden Town, is Thames Water’s responsibility, and it is treated at Rye Meads Sewage Treatment Works in East Hertfordshire. Thames Water’s developer guidance requires a build-over agreement when an existing property is altered or extended inside 3m of a public sewer, or inside 1m of a public lateral drain, and it prefers a diversion where new buildings would sit over a sewer. The 1991 Water Industry Act gives a right to connect on notice (section 106), and Thames Water adopts new sewers under section 104 agreements that follow Water UK’s Design and Construction Guide.
Flood zones, surface water and contamination
Harlow’s flood study puts the main river risk along the Stort: around Harlow Town station, Templefields north of the railway and the A414 roundabout south of it, all in Flood Zone 2. Parndon Brook puts some properties on Peacock Road, Greygoose Park and Tithelands in Flood Zone 3, and Templefields is also notably affected by surface water. Gibberd’s master plan concentrated industry in dedicated employment areas, and Policy PL10 asks for a preliminary risk assessment where land is considered contaminated, so desk studies are worth programming early on brownfield employment plots.
Checked October 2026 from council, water company and government sources. Rules and services change, so confirm the details for your address before you start.
AREAS COVERED
Harlow and around
Send us the postcode and we’ll confirm. Places we cover from Harlow include:
- Templefields
- The Pinnacles
- Burnt Mill
- Staple Tye
- Old Harlow
- Church Langley
- Newhall
- Mark Hall
- Latton Bush
- Great Parndon
- Kingsmoor
- Roydon
- Gilston
- Waltham Abbey
RELATED PAGES
HOW A PROJECT RUNS
From first call to handover.
- 01
Talk it through
Tell us what you want to build, where it is and what drawings or approvals you already have.
- 02
Visit and price
We look at the site, the access and the ground, then price the work from the drawings and specification.
- 03
Plan the build
We agree the programme, deliveries and any inspections, and who does what where other trades are involved.
- 04
Build and hand over
We run the work through to completion, with building control inspections at the stages the job needs them.
YOUR QUESTIONS
Groundworks in Harlow: common questions.
Can’t see your question? Call us on 01206 273689.
Do you carry out groundworks in Harlow and on the Garden Town sites?
We do. Harlow is roughly 46 road miles from Great Horkesley, towards the western edge of our working area. Our published Harlow work is the concrete staircases, columns and floors in a multi-storey building and the drainage repairs at The Meadows, with the Longshaws surfacing job in nearby Waltham Abbey. Developers, contractors, schools and healthcare estates are all welcome to send drawings.
Who do we deal with for sewer connections and adoption in Harlow?
Thames Water. Its statement of common ground with Harlow Council confirms it is responsible for wastewater disposal throughout the town. Connections are made on notice under section 106, and new sewers for adoption need a section 104 agreement and design to Water UK’s Design and Construction Guide. Your designer or engineer will set out what’s needed, and we build to the approved design.
Will a soakaway work on clay in Harlow?
Often not, but it has to be tested rather than assumed. Harlow’s flood study describes most of the bedrock as low permeability and calls early, site-specific infiltration testing imperative, while Essex County Council expects testing to BRE 365. Where the till or London Clay won’t take water, the scheme moves down the SuDS hierarchy that Policy PL11 requires, with attenuation that allows for climate change and runoff limited to the national technical standards.
Do you repair existing drainage as well as laying new?
Yes, as planned work rather than an emergency service. The Meadows job in Harlow involved finding and repairing faults at chambers, on service runs and in the roof-water arrangements of an existing property. We open up, repair and reinstate to an agreed scope. We don’t offer blocked-drain callouts or CCTV surveys, so any survey information comes from your consultant or the asset owner.
What decides the cost of groundworks on a Harlow site?
Pricing comes from your drawings and ground investigation plus a visit to the site; we don’t use standard rates. The biggest variables are dig depth and ground type, groundwater near the Stort, spoil quantities and disposal, the attenuation needed to meet Policy PL11, any contamination on former employment land, access and phasing. Sending the investigation with the tender drawings keeps provisional sums down.
START WITH THE BRIEF
Groundworks in Harlow? Send us the drawings.
Send us the site postcode, a short description of the work and any drawings you have. We’ll come back to you to talk it through and arrange a site visit where it’s needed.
CJC Contracts Ltd · The Mullions, Nayland Road, Great Horkesley, Colchester CO6 4HH
Request a no-obligation quotation
Fields marked * are required.
We’ll use your details to respond to your enquiry.
