August 31, 2025Lift shaft construction: reinforced concrete at heightThis reinforced concrete lift shaft is one of the most striking construction sequences in the CJC archive.
August 26, 2025Longshaws, Waltham Abbey: surfacing and drainage detailsThe Longshaws project at Waltham Abbey combines broad external surfacing with chamber details, kerbed islands and paths beside the building.
August 13, 2025Meadgate Centre, Chelmsford: external surface repairsThe Meadgate Centre photographs record an external concrete area with local patches, cracks and pronounced joints between sections.
August 6, 2025The Meadows, Harlow: drainage investigation and repairsThe Meadows project in Harlow records investigation around drainage chambers, service routes and roof-water details.