Can You Start Building Work Without a Party Wall Agreement? The Risks Nobody Mentions
November 8, 2026
What Happens If There’s No Party Wall Agreement? Disputes, Delays and Damage
November 10, 2026You should consent to a party wall notice when the work is minor, clearly described and you’re comfortable with the plans, because it is quicker and keeps things friendly. You should dissent and appoint a surveyor when the work is intrusive, such as digging deep foundations near your house, cutting into the shared wall or underpinning, or when the notice leaves questions unanswered. Either way, reply in writing within 14 days, and remember that saying no doesn’t stop the work. It just means surveyors settle how it’s done.
This guide is for the adjoining owner: the neighbour who receives the notice. It explains each option under the Party Wall etc. Act 1996, what each one costs you, and what to do in the first two weeks. It applies to England and Wales.
What are your options when a party wall notice arrives?
The GOV.UK explanatory booklet says you can give consent in writing, refuse consent (which starts the dispute process), or do nothing. In practice that gives you five routes:
| Your response | What happens next | Usually suits |
|---|---|---|
| Consent in writing | No surveyors are needed. Your neighbour can start once the notice period ends, or earlier if you agree in writing | Minor, well-described work where you trust the neighbour and builder |
| Dissent and agree one surveyor | A single “agreed surveyor” acts impartially for both of you and prepares an award | Moderate work where you want a formal record without the cost of two surveyors |
| Dissent and appoint your own surveyor | Each owner has a surveyor. They agree the award and select a third surveyor in case they can’t agree | Intrusive or complex work, or where you have concerns |
| Do nothing | For work to a party wall or nearby excavation, a dispute is deemed to have arisen after 14 days and surveyors are appointed | Rarely a good idea. You lose the chance to choose |
| Counter-notice | Within one month you can ask for extra or modified work for your benefit | When you’d like something done at the same time, such as deeper foundations or chimney breasts kept |
If you’re the one planning work rather than receiving a notice, start with our guide on how to serve a party wall notice.
When does consenting make sense?
RICS says you “may be quite agreeable to the works” and happy to consent. Consent tends to be the sensible choice when:
- the notice describes the work clearly and you understand exactly what will happen to the shared wall or near your foundations;
- the work is relatively light, such as inserting a beam bearing into the party wall for a loft or kitchen knock-through;
- you have a good relationship with your neighbour and they’ve talked the plans through with you;
- a competent builder is doing the job and there’s a clear way to raise problems.
Consent costs you nothing and avoids surveyors’ fees for your neighbour. The trade-off is that there is no award fixing working hours, protection measures or access arrangements, and no independent record of your property’s condition unless you make one.
That record matters. A schedule of condition (written notes and photographs of your side before work starts) isn’t required by the Act, but the GOV.UK booklet says it is “highly advised”. Without one, it may be hard to prove later that a crack was caused by the works. If you consent, agree with your neighbour that one will be taken and that you’ll each keep a copy.
When should you dissent and appoint a surveyor?
Dissenting is not hostile. It is simply the Act’s way of getting an impartial professional to settle how the work is done. It’s worth considering when:
- your neighbour plans to excavate within 3 metres of your building and deeper than your foundations, or within 6 metres where the dig would cut a 45-degree line down from your foundations (the section 6 rules);
- the work involves underpinning, raising or cutting into the party wall, or demolishing and rebuilding it;
- the notice is vague, has no drawings, or doesn’t say whether your foundations will be safeguarded;
- your home is older, already shows cracking, or has features you’re worried about, such as a shared chimney;
- you want agreed working hours, protection measures or access arrangements written down.
The surveyors’ award sets out the work, when and how it is done, any extra protective work, and usually records your property’s condition beforehand. It is final and binding unless either owner appeals to the county court within 14 days of it being served.
RICS recommends choosing a chartered surveyor (MRICS or FRICS) and warns that many people offering party wall services have little relevant experience. Once appointed, a surveyor can’t be removed by the owner who appointed them, and they must act impartially whoever pays them.
What happens if you just ignore the notice?
For work to an existing party wall (section 2) or excavation near your foundations (section 6), a dispute is deemed to have arisen if you don’t reply within 14 days. If you then don’t appoint a surveyor within 10 days of being asked, section 10(4) of the Act lets your neighbour appoint one on your behalf. So ignoring the notice doesn’t stop anything. It just hands the choice of surveyor to someone else.
A notice for a new wall on the boundary (section 1) works differently. If you don’t consent in writing within 14 days to a wall astride the boundary, your neighbour must build it wholly on their own land. For more on what neighbours can and can’t block, see can your neighbour refuse a party wall agreement?
Do you give up your rights if you consent?
No. The GOV.UK booklet is clear that consenting doesn’t remove your rights. If a problem comes up later, such as damage to your property, it can still be referred to the dispute process with surveyors. Whatever route you take, the building owner must:
- make good any damage caused by the works, or pay you in lieu if you ask;
- provide temporary protection for your property where needed;
- avoid causing unnecessary inconvenience;
- give 14 days’ notice before needing access to your property, except in an emergency.
You can also ask for security for expenses before work starts, though the booklet says this is usually reserved for particularly intrusive or complex works.
Who pays if you dissent?
In most cases, your neighbour does. RICS says a building owner will generally be required to pay the adjoining owner’s surveyor’s costs, with exceptions. Costs can be shared where work is needed because of a defect or disrepair in a shared wall, and you may face costs if you act unreasonably, for example by making demands that lead to pointless visits. Surveyors decide who pays as part of the award.
Agreeing to share one surveyor keeps costs down for your neighbour, and RICS notes it is “often considered a neighbourly thing to do”. For typical fee levels, see our guide to how much a party wall agreement costs.
What should you do in the first 14 days?
- Check the notice: names of all owners, the address, a full description of the work, the start date and a statement that it is served under the Act. Excavation notices should include plans and sections.
- Talk to your neighbour. The booklet says explaining your concerns can help them amend the plans and avoid a formal dispute.
- Decide: consent, agree one surveyor, or appoint your own. Ask a surveyor for advice if you’re unsure.
- Reply in writing within 14 days. If you want extra work done, say so within 14 days and serve a counter-notice within a month.
- Make sure a schedule of condition is taken before work starts, whichever route you choose.
Keep the notice, your reply and any award with your property documents. If the build is delayed, it’s worth knowing how long a party wall agreement lasts.
Frequently asked questions
Can I refuse consent and stop my neighbour’s extension?
No. The GOV.UK booklet says you cannot stop someone exercising their rights under the Act. Refusing consent means surveyors decide how and when the work is done, which can give you more protection.
How long do I have to respond to a party wall notice?
14 days from receiving it. For party wall and excavation notices, silence after 14 days counts as a dispute.
Can I consent with conditions?
You can tell your neighbour what you’d like, such as a schedule of condition or set working hours, and agree it in writing. Conditions in a simple consent aren’t decided by surveyors, though, so if the terms matter, an award gives them formal force.
Can I use the same surveyor as my neighbour?
Yes, as an agreed surveyor acting for both of you. They must act impartially. The surveyor shouldn’t already be supervising the building work, and you can’t act as your own surveyor.
Planning work next to a neighbour?
CJC Contracts is a Colchester-based building and groundworks contractor, established in 2007 and based in Great Horkesley, working across Essex and Suffolk. On extensions and foundations close to a boundary, we plan the programme around party wall notice periods and work to the agreed details. For a free quote, contact us or call 01206 273689.