What Does CDM Stand For in Health and Safety? A Simple Explainer
November 5, 2026
Can Your Neighbour Refuse a Party Wall Agreement? What Really Happens Next
November 6, 2026The CDM Regulations 2015 apply to all construction work in Great Britain, including building work on your own home. If you are paying someone to build an extension, convert a loft, rewire or renovate your house, CDM applies. The only real exception for homeowners is genuine DIY: when you do the work yourself, CDM 2015 does not apply.
The good news for homeowners is that, while CDM applies to your project, the client duties normally pass automatically to the builder you hire. This guide explains when CDM applies, what counts as “construction work”, how the rules work on domestic jobs and what you should check before work starts. If you want the basics first, read our guide to what the CDM Regulations are.
Do the CDM Regulations apply to domestic projects?
Yes. The Health and Safety Executive (HSE) is clear that CDM 2015 “applies to all construction work including domestic projects”. Before 2015 the rules treated homeowners differently, but the current regulations brought domestic work fully into scope.
The regulations define a domestic client as a client for whom a project is carried out “which is not in the course or furtherance of a business of that client”. HSE puts it more simply: you are a domestic client if the work is on your own home, or the home of a family member, and it isn’t connected to a business.
What changes for domestic clients is who carries the client duties, not whether the rules apply. On a typical house extension, the people building it take on those duties alongside their own.
What counts as “construction work” under CDM?
The definition is wide. Regulation 2 of CDM 2015 says construction work means any building, civil engineering or engineering construction work, and it includes:
- construction, alteration, conversion, fitting out, commissioning, renovation, repair, upkeep, redecoration or other maintenance, decommissioning, demolition or dismantling of a structure;
- preparing for a structure, including site clearance, exploration, investigation (but not site survey) and excavation;
- assembling or dismantling prefabricated elements on site;
- removing a structure, or waste from demolition or dismantling;
- installing, commissioning, maintaining, repairing or removing services normally fixed within or to a structure, such as electrical, gas, mechanical, hydraulic and telecommunications services.
Cleaning that uses water or an abrasive at high pressure, or corrosive or toxic substances, also counts as maintenance under the definition. In practice that means most jobs a homeowner pays a tradesperson to do are construction work: an extension, a new kitchen, a rewire, a new drain run, a re-roof or knocking through a wall.
Who takes on the client duties on a domestic project?
Under CDM 2015 the client has duties such as making suitable arrangements for managing the project, allowing enough time and resources, and making sure welfare facilities are provided. For domestic clients, HSE explains that these duties pass to others:
| Your project | Who carries the client duties |
|---|---|
| One contractor does all the work | The contractor, alongside their own contractor duties |
| More than one contractor | The principal contractor, alongside their own duties |
| You agree in writing with a designer (such as an architect) that they will manage the project | That designer, acting as principal designer |
| More than one contractor but no principal contractor appointed | The contractor in control of the construction work |
| You do the work yourself | Nobody: DIY is outside CDM 2015 |
HSE notes that for a single contractor this “should involve little more than what they normally do in managing health and safety risks”. Where a designer is to take on the client duties, there must be a written agreement with the domestic client confirming it. Without that written agreement, the duties automatically pass to the principal contractor.
When does a domestic project need a principal designer and principal contractor?
Whenever more than one contractor will work on the project, a principal designer and a principal contractor are needed. That trigger is easy to hit on a domestic job. An extension where one firm does the groundworks and shell, a separate electrician wires it and a plasterer finishes it is a multi-contractor project.
As a domestic client you don’t have to make these appointments yourself. If you don’t, the designer in control of the pre-construction phase becomes the principal designer and the contractor in control of the construction phase becomes the principal contractor. The principal contractor plans, manages and coordinates health and safety during the build, prepares the construction phase plan, organises site inductions, keeps unauthorised people out and provides welfare facilities.
Even on a single-contractor job, HSE says the contractor must prepare a construction phase plan. It should be proportionate: a short, practical document on a small extension, not a binder of paperwork.
Does my home project need to be notified to HSE?
Only large projects. Construction work is notifiable to HSE if it is expected to last more than 30 working days and have more than 20 workers working at the same time at any point, or to exceed 500 person-days of construction work. Notification is made online with form F10.
Most house extensions, loft conversions and renovations fall below those thresholds. Where a domestic project is notifiable, such as a large self-build, the contractor, principal contractor or principal designer who has taken on the client duties submits the notification, not the homeowner. Notification is separate from whether CDM applies: a project that doesn’t need notifying is still covered by CDM.
When are you not a domestic client?
The test is whether the work is done in the course or furtherance of a business. HSE gives landlords and developers as examples of clients who may have work done for a trade or business. If you are refurbishing a buy-to-let, converting a building to sell, or having work done on business premises, you are likely to be a commercial client with the full client duties yourself.
Commercial clients must make suitable arrangements for managing the project, appoint the principal designer and principal contractor in writing where there is more than one contractor, provide pre-construction information and make sure a construction phase plan is in place before work starts. Those duties don’t transfer automatically. Our commercial construction team works with landlords, schools and businesses who need to meet them.
What should a homeowner check before work starts?
Your legal duties are light, but your choices still affect how safely the job runs. Before you sign a contract, it is sensible to:
- ask your builder who will act as principal contractor if other trades are involved;
- ask to see the construction phase plan before work begins;
- share what you know about the house, such as the location of drains, services or suspected asbestos;
- agree access, toilet and welfare arrangements for the site team;
- keep any health and safety file or handover information when the work is complete.
CDM sits alongside, but separate from, building regulations. Since October 2023, building regulations also have their own principal designer and principal contractor roles for building regulations compliance. Our guide to what CDM stands for in health and safety explains the wider framework.
Frequently asked questions
Does CDM apply to a small domestic job like a bathroom refit?
Yes. Fitting out, renovation and installing services are all construction work under CDM 2015, whatever the size. The contractor carries your client duties, and their paperwork should be proportionate to the job.
Does CDM apply if I build my own extension?
Not to work you carry out yourself on your own home. HSE classes that as DIY, which CDM 2015 does not cover. If you then hire trades to do parts of the work, CDM applies to their work.
Does a landlord count as a domestic client?
Usually not. Work on a let property is generally done in the course of a business, so the landlord is likely to be a commercial client and keeps the client duties.
Can I be prosecuted under CDM as a homeowner?
Domestic clients’ duties are carried out by their contractor, principal contractor or principal designer, so it is those dutyholders who are responsible for meeting them. If you are unsure whether your project is domestic, ask before work starts.
Planning a home project in Essex or Suffolk?
CJC Contracts is a Colchester-based building and groundworks contractor, established in 2007 and based in Great Horkesley, working across Essex and Suffolk. We manage health and safety on our domestic projects, from house extensions to new builds, so you know who is responsible on site. For a free quote, contact us online or call 01206 273689.