School groundworks & external areas
Foundations, excavation, paths and agreed external works, coordinated with access, levels and the surrounding school grounds.
Explore the service →CJC CONTRACTS · COLCHESTER, ESSEX
Plan around the school.
Build for everyday use.
Construction, refurbishment and groundworks packages for schools and education settings. Based in Colchester, CJC Contracts works with clients and their project teams to define the building work, access arrangements and programme around the needs of the site.

SCHOOLS & CONSTRUCTION
School building work has to fit around people as well as the design. Classrooms, arrival routes, staff access and neighbouring areas may still be in use while a project is being planned or delivered. Early discussion of the work boundaries, available dates and site arrangements helps establish a realistic package.
Whether you are a school estates team, an academy trust, a consultant or a principal contractor, send the current drawings and explain what the building needs to do. We can discuss a specific construction stage or a broader package, with clear responsibilities for design, supply and handover.
DEFINE YOUR PACKAGE
Foundations, excavation, paths and agreed external works, coordinated with access, levels and the surrounding school grounds.
Explore the service →Changes to existing buildings, with the scope defined around the condition of the structure, the intended layout and the required finishes.
Explore the service →Construction packages for additional space, including the interface between existing buildings, foundations and the new structure.
Explore the service →Drainage runs, chambers and agreed ducting work, planned around existing services and reinstatement of the affected areas.
Explore the service →Structural openings and steel installation to the engineer's information, with access and temporary support arrangements clarified.
Explore the service →Timber work and finishing carpentry, with materials, door schedules and installation responsibilities agreed within the package.
Explore the service →BEFORE WORK BEGINS
Set out the available working period, examinations, school events and required handover date. Design decisions and material orders may need to be resolved before the holiday window begins.
Discuss the boundary of the working area, deliveries, pupil and staff routes, site induction and the school's safeguarding requirements before agreeing how the work will proceed.
Identify activities that could affect occupied areas. Any proposed interruptions to water, power, drainage or access need to be reviewed with the school and relevant project team.
Agree the inspection, finishing, cleaning and applicable handover information for the package. Include time to review outstanding items before the affected space returns to use.
FROM THE CJC PROJECT LIBRARY
Education archive · August 2010
Archive photographs from the Brentwood school folder show masonry, structural beams and scaffolded working areas during building work. Close views record the junctions between the new structural elements and the surrounding blockwork, with temporary access in place around the construction area.


EDUCATION · ESSEX
CJC also carried out demolition work at the University of Essex for Stroods. For an education-site enquiry, send the scope, site location and programme so we can discuss the construction package and site arrangements.
Discuss an education-site project →YOUR QUESTIONS
More about quotations, timing and construction packages in our building FAQs.
We can discuss the available holiday period and the work you want completed within it. Suitability depends on the scope, design readiness, materials and access. Share your dates early so the sequence and any work needed beforehand can be considered.
This is assessed for the particular package. Safe separation, safeguarding arrangements, access, noise, dust and service availability all influence whether areas can remain occupied. The arrangements must be agreed with the school and project team.
You can enquire about a defined package such as drainage, external works, structural alterations or carpentry, as well as a wider construction brief. Include the site postcode, drawings and timing so we can discuss suitability.
The Brentwood construction images on this page are from the project archive. Their camera metadata records August 2010. We identify the age of archive photographs rather than present them as newly completed work.
Send the site address, current drawings and specification, scope schedule, available working dates, access restrictions and required tender documentation. Explain which design and supply responsibilities are included in the proposed package.
START WITH THE BRIEF
Send the site postcode, drawings or scope, proposed working dates and any access or operational requirements.
01206 273689Based in Great Horkesley, Colchester.
Fields marked * are required.
We’ll use your details to respond to your enquiry.