The university entrance project involved forming a substantial concrete staircase against an existing brick building. The photographs record two important parts of the work: concrete being placed in the foundations and the timber formwork that establishes the rising stair profile above them.
The timber assembly can look like a ramp at first glance because the underside follows an incline. Its purpose is to support and contain the concrete while the individual steps are formed. The inclined base, side shutters and riser positions work together to create the staircase geometry.
Setting out from the entrance level
The existing doorway is the fixed point for the new work. From that level, the staircase has to reach the ground below through a consistent series of rises and treads. The top landing, lower approach and any later finishes all affect the setting out.
This is a stage where small discrepancies can accumulate. If the total height is not reconciled with the number of steps and the finished levels at each end, the first or last rise can end up different from the rest. Establishing the geometry before building the formwork is therefore essential.
Preparing and pouring the foundations
The groundwork photographs show open foundation runs and operatives placing concrete through a delivery hose. The concrete follows the excavated footprint beside the building, creating the support for the entrance construction above.
The preparation for that pour includes establishing suitable formation, confirming the intended footprint and coordinating the connection to the existing premises. Concrete then needs to be distributed through the prepared area in an organised sequence, with the level controlled so that the next construction stage starts from the correct position.
Building the inclined formwork and risers
The stair photographs show the timber structure from the front and side. Long inclined members support the underside, while cross-pieces and boards define the step arrangement. Additional timber at the sides and landing contains the edges of the eventual concrete.
This is temporary construction with a very direct effect on the permanent result. The formwork must maintain the intended shape while carrying the wet concrete and the loads associated with placing it. Bracing, connections and support positions form part of the complete arrangement; the visible surface boards are only one component.
Reinforcement and the next concrete stage
Reinforcement for a concrete stair has to be coordinated with the inclined slab, landings and supporting construction. It needs to be held in the position required by the design, with appropriate space between the steel and the form faces. Those details are addressed before the staircase pour closes the assembly.
The next stage after the recorded shuttering is to place and compact the concrete through the stair form, work the treads and landing to their intended profile, and allow the concrete to develop before removing support in the specified sequence. The poured foundations and prepared stair formwork establish the structure and geometry needed for that next stage, linking the below-ground work to the new entrance above.
The seven-image sequence follows the construction of the entrance: establishing levels, constructing the support below, forming the inclined stair and preparing the permanent concrete entrance.
You can explore our approach to formwork and reinforcement in Essex and Suffolk on the relevant service page.