Skip to content

PROJECT STORIES · FORMWORK AND REINFORCEMENT

Thor 5: reinforced concrete and service ducting

From the CJC project archivePublished

Reinforced concrete forms coordinated with service ducts at Thor 5

Thor 5 is a detailed example of reinforced concrete construction coordinated with a substantial service-duct arrangement. The photographs show long formed concrete runs, reinforcement cages, boxed openings and groups of ducts passing through or beside the work before the concrete closes those interfaces.

The complexity lies in the junctions. Structural steel reinforcement and service routes need to occupy the same limited footprint without conflicting, and the positions of each must be settled before the pour makes alteration difficult.

Forming the concrete layout

Timber shutters define long narrow elements and larger local boxes within the excavated area. The reinforcement follows those changes, with corners and intersections showing a denser arrangement of bars than the straight sections.

Setting out therefore needs to account for the whole layout. The edge of a concrete beam, the size of a reserved opening and the route of a duct all influence one another. The photographs taken along the forms make that relationship particularly clear.

Bringing multiple ducts into position

Bundles of dark ducts bend into the work area and terminate at defined positions. Their alignment has to be maintained during the surrounding construction, with protection against debris entering open ends before the services are installed.

The ducts also affect how reinforcement and formwork can be assembled. Openings need to be allowed for deliberately, with the structural arrangement following the design around them. Forcing a route through an already completed concrete element would be a much more disruptive solution.

Checking before concrete placement

Before pouring, the prepared assembly needs to be reviewed as a coordinated package: shutters stable, reinforcement supported, duct positions secured and reserved spaces correctly formed. The close photographs show why a single wide site view would miss much of the work.

Concrete then has to be placed around the details without displacing them. Local congestion can make access for compaction more demanding, so the placing sequence needs to take account of the actual geometry within the forms.

Completing the concealed work

The later views show concrete surfaces around the planned openings and projecting ducts. Once the surrounding ground is reinstated, much of this preparation will no longer be visible, but its accuracy remains important to the service installation that follows.

The seventeen-image set records the different runs and junctions. It demonstrates how formwork, reinforcement and service coordination become one construction task when the work has to be resolved before concrete is placed.

CJC undertakes formwork and reinforcement in Essex and Suffolk, from individual repairs to wider construction packages.