Building a seven-bedroom home: from the first excavation to the final coat of paint

Seven-bedroom red-brick house with clay roof tiles, dormers and a timber-clad wing
Red brick, clay tiles and timber define the finished house.

Hawthorn House is an illustrative construction walkthrough, rather than a record of a completed CJC project. The seven-bedroom house design and its illustrations show how groundworks, structure, services and finishes connect during a new build. They do not document a real client commission.

The example combines a red-brick main house, clay roof tiles and a timber-clad wing. A central entrance connects living rooms and a study with a kitchen, dining and family space overlooking the garden. The proposed arrangement places a guest bedroom downstairs, four bedrooms on the first floor and two in the roof.

Every real site needs its own design, surveys, approvals and construction plan. The sequence below explains the relationships between the stages; the project team would agree the actual methods and details for the particular building.

Planning the build before breaking ground

The architectural layout needs to be considered alongside the structural and building-services designs. In this example, the wide garden opening, upper-floor bathrooms and roof-level bedrooms would affect beams, drainage routes and staircase positions. Resolving those connections early helps the team understand what must be built before later trades arrive.

A programme would also account for items such as steel, windows, the staircase and kitchen cabinetry. Material samples and room layouts can help settle decisions while there is still time to coordinate the work.

Site set-up, clearance and setting out

The construction plan would establish the site boundary, welfare arrangements, delivery access and any retained features. Available service information and appropriate site checks would inform the work before excavation. Setting out would connect the building footprint to surveyed reference points, boundaries and agreed floor levels.

Excavation and foundations

The foundation arrangement would follow the engineer’s design and the information about the ground. Excavation, inspections, reinforcement or formwork where specified, and concrete placement would be planned together. A change in the ground encountered would need to be reviewed before the work proceeded on an assumption.

Foundation levels and service crossings would be coordinated so that subsequent work could connect to the substructure. Our groundworks service explains the information that helps define a real construction package.

Below-ground drainage and incoming services

Bathroom, kitchen and utility positions influence drainage routes. The design would establish gradients, levels, access points and the surface-water arrangement. Incoming services would also need planned routes. Recording work before it is covered provides useful information for inspections, handover and later alterations.

Constructing the ground floor

The ground-floor construction would be selected through the design process. For a suspended floor, the bearings, supporting walls and ventilation routes would need coordination. Moisture-control layers, insulation and service penetrations would follow the specified details.

The different final finishes would be allowed for before screeding or other levelling work. A kitchen floor and an adjoining timber floor, for example, need compatible finished levels.

Brickwork, blockwork and structural steel

The example uses a red-brick outer face with internal supporting construction designed for the house. Openings, lintels, wall ties, insulation and cavity details would be checked as the walls progressed. Any steelwork supporting wider openings would follow the engineer’s design, with its connections and surrounding protection resolved as part of the building details.

Upper floors, partitions and the staircase opening

The floor structure would be coordinated with the staircase, room divisions and service routes. Structural members cannot simply be altered to fit a later pipe route. The design would also identify backing for cupboards and other fixtures, together with acoustic and fire-related details applicable to the building.

Roof carpentry, dormers and clay tiling

The illustrated roof includes dormers serving the upper bedrooms and a lower roof over the wing. Supports, bracing and openings would be formed to the structural design. The covering, ventilation, insulation and weathering details would need to work together around eaves, dormers, valleys and other junctions.

Windows, external doors and timber cladding

Openings would be checked against the ordered windows and doors, including the allowances needed for installation. The timber-clad wing would require coordinated support, drainage and ventilation details. These interfaces matter because the finished appearance depends on work that is largely concealed once the building is enclosed.

First-fix plumbing, electrics, heating and ventilation

Room layouts would guide first-fix service positions. Kitchen appliances, bathroom fittings, lighting and heating controls should be considered before walls and ceilings are closed. The responsible specialists would agree the installation, inspection and testing requirements for their work.

Screeding, plasterboarding and drying out

The programme would allow for the specified floor construction and the moisture conditions needed by later finishes. Before boarding over services, relevant checks and records would be completed. Decoration and floor installation would follow when the substrates met the requirements of the chosen materials.

Kitchen, pantry and utility installation

In this example, the kitchen includes an island and separate utility space. Their dimensions and service positions would be checked against the constructed rooms. Cabinetry, worktops, appliances and extraction need an agreed sequence so that one installation does not obstruct the next.

Bathrooms, tiling and sanitaryware

Bathroom layouts would be coordinated with drainage, ventilation, supporting construction and the chosen finishes. Specified waterproofing and other concealed details would be completed and checked before tiling covered them. Accessible maintenance points would also form part of the installation plan.

Floors, internal doors and second-fix carpentry

Final flooring would be installed under suitable site conditions and protected from following work. Doors, skirtings, architraves and other joinery would be coordinated with finished floor levels. This stage brings the early dimensional decisions into view.

Decoration and finishing touches

Preparation would be matched to the substrate and the specified coating system. A finishing sequence would account for drying, ventilation and access, with completed surfaces protected while other trades finished their work. Small adjustments and local making-good would be recorded for the final review.

Driveway, terrace and garden works

The external design would connect the entrance, terrace, paths and garden to the building’s levels and drainage. Heavy construction traffic would be considered when programming finished surfaces. The illustrated planting beds and driveway show a possible final arrangement, not completed works on a real CJC commission.

Testing, snagging and handing over the keys

A real handover would bring together the agreed inspections, specialist testing, operating information and outstanding-item list. Responsibilities and follow-up arrangements would be clear to the client. Hawthorn House illustrates that connected sequence; for photographs of actual CJC work, explore our project selection and the Mullions basement construction story.