Skip to content

PROJECT STORIES · FORMWORK AND REINFORCEMENT

Leigh-on-Sea: reinforced concrete floor construction

From the CJC project archivePublished

Reinforced floor deck with a boxed opening at Leigh-on-Sea

The Leigh-on-Sea project records a reinforced concrete floor being formed and poured above the surrounding street level. Timber deck formwork, reinforcement details, boxed openings and concrete placement are all visible, followed by views of the completed concrete surface.

This is a strong construction sequence because it reveals both the broad floor area and the details that interrupt it. A suspended slab has to be coordinated with its supports, perimeter and openings before concrete delivery starts.

Assembling the floor formwork

The early photographs show the timber deck and supporting members, with openings reserved within the footprint. Large sheet materials provide the form face, while the perimeter and local boxes establish the concrete edges.

The supporting system carries the deck, reinforcement and wet concrete during construction. Its layout therefore needs to suit the pour and the structure below. The working surface above also has to remain stable enough for fixing steel and setting out the smaller details accurately.

Reinforcement around openings and junctions

Close views show bars concentrated at slab edges and corners, with bent reinforcement passing around formed details. These areas need more coordination than the regular grid across the open floor because forces and geometry change at the interruption.

Service penetrations and other openings must be allowed for before the pour. Their position has to be reconciled with the reinforcement arrangement, avoiding an improvised alteration after the concrete is complete. The gallery now includes these close details alongside the wider deck views.

Pouring and finishing the slab

A concrete pump reaches over the prepared floor, and the sequence shows the placed material advancing across the reinforcement. The team works within the defined perimeter, with completed and unfilled areas visible in the same view.

An organised placing route allows the concrete to be distributed, compacted and finished while access remains available to the working face. The later photographs show the resulting surface after the reinforcement and most of the formwork detail have disappeared from view.

The complete record demonstrates how the final floor depends on temporary support and careful preparation. It follows the slab from a timber-and-steel assembly to a permanent concrete element, with enough intermediate photographs to explain what happened between those stages.

You can explore our approach to formwork and reinforcement in Essex and Suffolk on the relevant service page.