High Chelmer, Chelmsford — concrete foundations

At High Chelmer in Chelmsford, new concrete foundations were formed within an existing structural setting. The photographs show timber shutters passing between steel columns, reinforcement cages at changes in the layout and concrete elements after the forms were removed.

Working within an established frame changes the nature of foundation construction. The new work has to fit the geometry already present, with column bases, existing floor edges and access routes influencing where plant and materials can go.

Setting out around the existing frame

The steel columns provide prominent fixed points throughout the sequence. Timber formwork defines the new concrete runs around them, including rectangular returns and intersections. The layout needs to respect those existing positions while producing the dimensions required for the new construction.

The space between columns also affects the practical work. Excavation and preparation have to leave room to assemble reinforcement and shutters, while still allowing concrete to reach the forms. The compact excavator visible in the work area gives a sense of the available access.

Reinforcement at the critical junctions

The open cages reveal how the concrete elements connect through the prepared footprint. Where the layout changes direction or increases in depth, the reinforcement and formwork become more complex than in a straight run.

These junctions need to be coordinated before pouring because the geometry becomes fixed once the concrete has hardened. The shutters must retain the wet concrete, while the reinforcement needs to stay supported and correctly positioned through the placing operation.

From temporary forms to permanent foundations

Later photographs show solid concrete faces beside areas where the reinforcement is still exposed. This captures the project between successive operations, with completed elements establishing references for adjoining work.

The sequence illustrates the practical value of accurate formwork in a constrained commercial setting. The visible timber is temporary, but its line, level and stability determine the concrete left behind. The fuller gallery shows that relationship from several angles, including the connections to the existing steel frame.