Support for existing buildings. A properly defined construction plan.
CJC Contracts can discuss underpinning construction where an appointed structural engineer has established the need and designed the work. Based near Colchester, we consider projects across Essex and Suffolk, bringing foundation, excavation and concrete construction experience to the agreed package. Share the investigation findings and design so we can review access, construction requirements and the work needed around the existing building.
Share your plans, photographs and site postcode. We’ll discuss the work and the next useful step.
Related work: foundation investigation beside an existing wall
Established 2007Based in ColchesterReal project photographsWorking across Essex & Suffolk
THE WORK YOUR PROJECT NEEDS
Understand the foundations. Then define the work.
Underpinning strengthens or extends the support beneath an existing foundation. It may be specified following an investigation into movement or as part of a planned alteration, but the appropriate solution depends on the cause, the building and the ground. Cracking alone does not establish what work is needed. The engineer’s assessment provides the starting point for a useful construction quotation. We review that information alongside site access, drainage, services and the adjoining structures so the practical scope is understood before work is arranged.
01
Engineer-designed underpinning
Construction of the specified foundation-support works within a clearly defined package. Agree the design information, construction method, temporary support and inspection arrangements with the project team before excavation begins.
02
Investigation and enabling works
Discuss agreed trial-hole excavation, access preparation and protection needed ahead of the main works. Coordinate the investigation with the engineer so the exposed details answer the questions relevant to the design.
03
Associated concrete and making good
Include the concrete construction and agreed reinstatement around the underpinning scope. Identify any drainage alterations, floor repairs or surface finishes separately so the quotation covers the complete work intended.
Related concrete work: basement reinforcement — The Mullions
FROM CJC’S PROJECT ARCHIVE
Foundation investigations. Concrete construction experience.
Our foundation-investigation photographs show local excavation beside an existing wall and measurements of the exposed construction. The Mullions archive records reinforced basement concrete work, including the base and wall reinforcement. These related projects illustrate practical excavation and concrete experience relevant to a defined underpinning package. The photographs are labelled by their actual project; the method and scope for your building will come from its own assessment and design.
Structural assessment, investigation findings and issued design
Defined construction method and temporary works responsibilities
Known services, drainage and neighbouring structures
Inspection stages, records and any monitoring requirements
Access, protection, reinstatement and completion information
Related concrete construction — The Mullions new-build project
HOW THE WORK COMES TOGETHER
Assess and design. Agree the construction.
Agree the scope, construction information and practical arrangements before the work starts.
01 / THE NEXT STEP
Bring together the site information
Send the address, photographs, engineer’s assessment and available foundation drawings. Explain any previous investigations and the purpose of the proposed work.
02 / THE NEXT STEP
Agree a buildable package
Review the design, method and access with the project team. Define temporary works, inspections, responsibilities and reinstatement before confirming the construction quotation.
03 / THE NEXT STEP
Construct to the agreed requirements
Carry out the specified package within the agreed method and inspection arrangements. Refer unexpected conditions to the design team, then complete the required records and making good.
SCOPE & COSTS
Price the work your site needs.
Send your plans and details of the underpinning project you have in mind. We’ll review what needs to be included and what information is still needed.
The length of foundation involved is only one factor. The engineer’s design, ground conditions, depth, access and the relationship with adjacent structures affect the construction package. Restricted working space, services, drainage diversions and the extent of reinstatement may also influence the price. Temporary works, inspections and any monitoring should have clear responsibilities. A defined design and investigation record allow the quotation to describe the actual work, with assumptions and exclusions visible before the project begins.
Plan structural stability throughout the work
Working beside and below an existing foundation needs a method appropriate to that structure. The appointed engineer and temporary works designer should establish the support and sequencing requirements, with inspection and change-control arrangements agreed before construction. HSE guidance stresses assessment and competent planning for work that may affect structural stability. Tell us about existing reports, neighbouring buildings and any restrictions identified by your professional team so these can be considered in the construction scope.
From our Great Horkesley base near Colchester, CJC considers engineer-designed underpinning packages across Essex and Suffolk. Send the available professional information so we can discuss the practical construction work and whether the project is suitable for our team.
Explore the related work that may form part of your project:
A crack can have different causes, and underpinning should follow an appropriate assessment. Ask a suitably qualified structural engineer to investigate the building and recommend the next step before commissioning foundation-support work.
Can you quote from my engineer’s design?
Yes. Send the current design, investigation findings and site details so we can review the construction package. The quotation will depend on the scope, access and responsibilities being sufficiently defined.
Can you excavate trial holes first?
We can discuss agreed trial-hole work directed by the investigating professional. Establish the required locations, exposure, inspection timing and reinstatement before the visit.
Do you handle the structural diagnosis and design?
This service covers construction of the agreed works. The structural engineer and other appointed professionals establish the cause, design and any monitoring or specialist assessment required for the building.
LET’S DISCUSS YOUR PLANS
Discuss your underpinning project.
Tell us about your underpinning project so we can discuss the site, scope and proposed timing.