Skip to content

CJC CONTRACTS · COLCHESTER, ESSEX

Steel fixing contractors in Essex & Suffolk

Reinforcement in place.
Ready for the next stage.

CJC Contracts provides steel fixing within reinforced concrete construction packages across Essex and Suffolk. We work from the structural engineer’s drawings and reinforcement schedules, coordinating the bars and mesh with formwork, openings and the planned concrete pours.

Share your plans, photographs and site postcode.
We’ll discuss the work and the next useful step.

Steel reinforcement grid over a prepared concrete slab area at Colchester Hospital
Slab reinforcement before the pour — Colchester Hospital
Established 2007Based in ColchesterReal project photographsWorking across Essex & Suffolk

THE WORK YOUR PROJECT NEEDS

The concrete depends on
what is fixed inside it.

Reinforcement needs to arrive in the right sequence and fit the structure as designed. Before work begins, we review the current drawings, bar schedules, delivery arrangements and interfaces with other trades. Queries about congested junctions, penetrations or revised details should be resolved with the designer before the affected work is covered.

01

Slabs and foundations

Mesh and bar reinforcement for structural slabs, foundations and bases, with the specified support, cover and continuity details.

02

Walls, beams and shafts

Fixing within more complex reinforced concrete elements, coordinating working access, shutters and the sequence of adjacent pours.

03

Combined concrete packages

Steel fixing alongside CJC formwork and concrete work so responsibility for preparation, inspections and pour readiness is clear.

Reinforced basement base with wall starter bars at The Mullions
Basement reinforcement — The Mullions new-build project

FROM CJC’S PROJECT ARCHIVE

Reinforcement visible
before the concrete arrives.

CJC’s Colchester Hospital photographs show reinforcement laid out during the concrete construction stage. The Mullions new-build archive also records reinforcement across a basement base. These photographs document work that becomes concealed once the concrete is placed.

  • Current drawings and bar bending schedules
  • Reinforcement supply and delivery sequence
  • Cover, support and spacer requirements
  • Openings, cast-in items and service interfaces
  • Inspection arrangements before concrete placement

Colchester Hospital: groundworks for a new ward

The Mullions: new-build basement construction

HOW THE WORK COMES TOGETHER

Define the work.
Plan each stage.

Agree the scope, construction information and practical arrangements before the work starts.

  1. 01 / THE NEXT STEP

    Review the reinforcement

    Check the package, current information and supply responsibilities.

  2. 02 / THE NEXT STEP

    Plan access and sequence

    Coordinate fixing with shutters, lifting arrangements and adjacent trades.

  3. 03 / THE NEXT STEP

    Fix and prepare for inspection

    Complete the defined work and arrange the agreed checks before the pour.

SCOPE & COSTS

Price the work
your site needs.

Send your plans and details of the steel fixing you have in mind. We’ll review what needs to be included and what information is still needed.

Request a quotation

What influences the cost?

Reinforcement quantity is only one part of a steel-fixing quotation. Bar complexity, congestion, access, lifting, working height and the number of separate work stages affect labour and programme. State whether steel supply, unloading, formwork and concrete are included or separately appointed.

Revisions need to reach the workface

A revised opening or structural connection may alter reinforcement already planned for installation. Use an agreed drawing register and resolve changes through the appointed engineer. CJC does not substitute site judgement for missing structural design information.

BASED IN GREAT HORKESLEY

Local projects.
Connected services.

Based in Great Horkesley, Colchester, CJC considers steel fixing projects across Essex and Suffolk. Send the site postcode and scope so we can discuss access, the work involved and a suitable programme.

Explore the related work that may form part of your project:

Explore all services

BEFORE YOU BEGIN

Your questions,
answered.

Have something specific in mind?
Call 01206 273689

Can steel fixing be included with formwork?

Yes. We can review a combined package covering reinforcement, formwork and concrete, with the scope of each element identified.

Do you work to bar bending schedules?

The current structural drawings and schedules form the basis of the work. Send the available information with your enquiry.

Can you price a labour-only package?

Tell us how you intend to procure the work. We can discuss the proposed package, including who supplies reinforcement, lifting and access arrangements.

When should reinforcement be checked?

The agreed inspections need to take place before the relevant work is concealed by concrete. Responsibilities and notice periods should be set within the project programme.

LET’S DISCUSS YOUR PLANS

Discuss your steel fixing.

Tell us about your steel fixing so we can discuss the site, scope and proposed timing.

01206 273689

CJC Contracts · Great Horkesley, Colchester
Building and construction since 2007.

Useful to include

Site postcode, structural drawings, reinforcement schedules, quantities and proposed package responsibilities.

Request a quotation

Fields marked * are required.

    We use your details to respond to your enquiry. Read our Privacy Policy. Please do not send sensitive personal information.

    We use your details to respond to your enquiry. Privacy Policy.