When Do the CDM Regulations Apply? Domestic Projects Explained
November 5, 2026In health and safety, CDM stands for Construction (Design and Management). It is short for the Construction (Design and Management) Regulations 2015, the law that sets out how health and safety must be planned and managed on building projects in Great Britain. When a builder, architect or HSE inspector talks about “CDM”, they mean these regulations and the duties they create.
The name tells you a lot about what the rules do. They cover construction work, they bring design into the safety conversation from the very start, and they focus on management: planning, coordinating and sharing information, not just hard hats and hi-vis.
What does each part of “CDM” mean?
- Construction: the regulations apply to construction work in the broadest sense. That includes building, altering, repairing, maintaining and demolishing structures, site clearance and excavation, and installing fixed services such as electrics and gas.
- Design: anyone who prepares or modifies a design as part of a business is a “designer” under CDM. Designers must eliminate, reduce or control foreseeable risks in how the structure is built, used and maintained. A safer detail on a drawing can remove a hazard before anyone sets foot on site.
- Management: clients, principal designers and principal contractors must plan, manage, monitor and coordinate health and safety throughout the project, with the right people appointed at the right time.
Where did the CDM Regulations come from?
CDM is not new. HSE’s timeline shows three versions:
| Regulations | Came into force | Key point |
|---|---|---|
| CDM 1994 | March 1995 | First regulations bringing design and management duties into construction safety |
| CDM 2007 | April 2007 | Replaced CDM 1994; introduced the CDM coordinator role |
| CDM 2015 | 6 April 2015 | Current version; put the client at the centre, created the principal designer role, and applied the rules fully to domestic projects |
So if you see older documents mentioning a “CDM coordinator” or “planning supervisor”, those roles belong to earlier versions. Under CDM 2015, the equivalent planning role is the principal designer.
For a fuller guide to what the current rules require, read our explainer on what the CDM Regulations are.
Who does CDM apply to?
HSE is clear that CDM 2015 applies to all construction work, including domestic projects. It names seven dutyholders:
- Commercial clients: anyone having work done as part of a business.
- Domestic clients: people having work done on their own or a family member’s home, not as part of a business.
- Designers.
- Principal designers, appointed where there is more than one contractor.
- Principal contractors, appointed where there is more than one contractor.
- Contractors.
- Workers.
A homeowner’s client duties normally pass to the contractor on a single-contractor job, or to the principal contractor where there are several. If you do the work yourself as DIY, CDM does not apply.
What does CDM look like on a real site?
On a well-run job, CDM shows up in a few practical ways:
- Pre-construction information: the client passes on what they know about the site, such as existing drawings, asbestos surveys and the location of buried services.
- A construction phase plan: written before the site is set up, setting out the safety arrangements and site rules. On small jobs HSE says it should be proportionate, and a simple plan is usually enough.
- Site inductions, security and welfare: the principal contractor makes sure everyone on site knows the rules, keeps unauthorised people out and provides toilets, washing facilities, drinking water and somewhere to rest.
- Coordination: contractors work to the plan and cooperate with each other, which matters most where trades overlap, for example during groundworks, deep excavations or work near live drainage.
- A health and safety file: on projects with more than one contractor, the principal designer compiles information the client will need to maintain or alter the building safely in future.
Why should you care about CDM as a client?
If you are a landlord, developer, school or business, CDM puts real legal duties on you. You must make suitable arrangements for managing the project, allow enough time and resources, provide pre-construction information, and appoint a principal designer and principal contractor in writing where more than one contractor is involved. If you fail to make those appointments, the law treats you as having to carry out those roles yourself.
Where an HSE inspector finds a material breach, HSE can recover its costs through the Fee for Intervention scheme, currently £188 an hour, as well as issuing notices or prosecuting. Planning safety properly at the start is far cheaper than any of that, and it usually makes the programme run more smoothly too.
Does every CDM project have to be reported to HSE?
No. Every project must be planned and managed under CDM, but only larger ones are notifiable. A project must be notified on HSE’s online F10 form if the construction work is expected to last longer than 30 working days with more than 20 workers on site at the same time at any point, or to exceed 500 person days. Most home improvement projects fall well below those thresholds.
Is CDM the same as Building Regulations?
No, though the two are often confused because both now use the terms “principal designer” and “principal contractor”. CDM is about the health and safety of people building, using and maintaining a structure, and HSE enforces it. Building Regulations set technical standards for the finished building, such as structure, fire safety and energy efficiency, and are checked by building control. Since October 2023, Building Regulations have their own dutyholder roles, which are separate from the CDM roles even when the same firm holds both.
Frequently asked questions
Is CDM a law or just guidance?
It is law. The CDM Regulations 2015 are a statutory instrument made under the Health and Safety at Work etc. Act 1974. HSE also publishes guidance, including L153, to explain how to comply.
What does a CDM principal designer do?
They plan, manage and coordinate health and safety during the pre-construction phase, help the client gather pre-construction information, work with other designers to reduce risks, and prepare the health and safety file.
Does CDM apply to maintenance work?
Yes. Repairing and maintaining a structure, and maintaining fixed building services, both fall within the definition of construction work.
Who enforces CDM?
HSE in most cases. Regulation 6 sends notifications to the Office of Rail and Road for certain railway work and to the Office for Nuclear Regulation for nuclear sites.