What Is Building Control — and Why Can It Stop Your Project?
October 30, 2026Building regulations are the legal minimum standards for how building work is designed and carried out in England. They cover structure, fire safety, damp, ventilation, drainage, insulation, electrical safety and access, and they apply to most extensions, loft and garage conversions, structural alterations and new homes, even when you don’t need planning permission.
They’re made under the Building Act 1984 and set out in the Building Regulations 2010. Planning decides whether you can build something; building regulations decide how it must be built. Here’s what that means for a homeowner.
What do building regulations actually cover?
The technical requirements sit in Schedule 1 of the Building Regulations 2010, split into lettered parts. Each part has an Approved Document published by the government that explains the usual ways to comply. These are the parts, as listed in the government’s building regulations and approved documents index:
| Part | Covers | What it means on a typical home project |
|---|---|---|
| A | Structure | Foundations, beams, lintels and walls strong enough for the loads |
| B | Fire safety | Escape routes, fire doors, smoke alarms, fire spread between homes |
| C | Site preparation and resistance to contaminants and moisture | Damp-proofing, radon protection, keeping ground moisture out |
| D | Toxic substances | Cavity wall insulation materials |
| E | Resistance to the passage of sound | Sound insulation between homes and in new rooms |
| F | Ventilation | Extract fans, trickle vents, air quality |
| G | Sanitation, hot water safety and water efficiency | Bathrooms, hot water systems, water use in new homes |
| H | Drainage and waste disposal | Foul and rainwater drainage, soakaways, building near sewers |
| J | Combustion appliances and fuel storage | Boilers, stoves, flues and hearths |
| K | Protection from falling, collision and impact | Stairs, balustrades, safety glazing |
| L | Conservation of fuel and power | Insulation, windows, heating efficiency |
| M | Access to and use of buildings | Level access, door widths, switch heights |
| O | Overheating | Limiting solar gain in new homes |
| P | Electrical safety | Safe design and installation of electrics in homes |
| Q | Security | Secure doors and windows in new homes |
| R | Electronic communications infrastructure | Gigabit-ready ducting in new buildings |
| S | Electric vehicle charging | Charge points or cable routes in new homes |
| T | Toilet accommodation | Toilets in new non-domestic buildings |
On top of the lettered parts, Regulation 7 requires building work to be done with adequate and proper materials, in a workmanlike manner.
Are the Approved Documents the law?
Not exactly. The regulations themselves are written as functional requirements, for example that a building must be constructed so that it safely carries its loads. The Approved Documents give practical guidance on meeting those requirements. Following them is the normal way to show compliance, but a designer can use another solution if they can prove it achieves the same standard.
Which home projects need building regulations approval?
Most structural or new work does. Common examples include:
- house extensions of any size, including single-storey rear extensions built under permitted development
- loft conversions and garage conversions into habitable rooms
- removing or altering a load-bearing wall, or forming a new opening
- new or altered underground drainage
- installing a new boiler, heating system or wood-burning stove
- some electrical work, such as a new circuit or consumer unit
- replacement windows and doors
Some of these, such as boilers, electrics and windows, can be self-certified by an installer registered with a government-authorised competent person scheme, so you don’t need to apply to building control yourself. The installer notifies the work and you receive a compliance certificate.
Small detached outbuildings are usually exempt. The Planning Portal says building regulations won’t normally apply to a detached building under 15 square metres with no sleeping accommodation, or one between 15 and 30 square metres with no sleeping accommodation that is at least one metre from a boundary or built substantially of non-combustible materials.
Is building regulations approval the same as planning permission?
No, and mixing them up is one of the most expensive mistakes homeowners make. A project can be permitted development, so no planning application is needed, and still need full building regulations approval. Our guide to permitted development vs planning permission covers the planning side, and our guide to how much you can extend your house sets out the size limits. Building regulations apply in addition to both.
How do you get building regulations approval?
First you choose a building control body: either your council’s building control team or a private registered building control approver. Since April 2024 private approvers and individual building inspectors have had to register with the Building Safety Regulator, part of the Health and Safety Executive. Then you choose a route:
| Route | How it works | Best for |
|---|---|---|
| Full plans | Detailed drawings and calculations are checked before work starts. The council must decide within five weeks, or up to two months if you agree. | Extensions, conversions and anything structural |
| Building notice | No plan approval; compliance is checked through site inspections | Small, simple domestic jobs. Not allowed for buildings covered by the Regulatory Reform (Fire Safety) Order 2005 |
| Regularisation | Retrospective application for work already done without approval | Putting right unauthorised work carried out since 11 November 1985 |
According to the Planning Portal, a full plans approval is valid for three years from the date the plans were deposited; if work hasn’t started by then, it can be declared of no effect. Councils also now require a commencement notice at least two days before work starts. Inspectors then visit at key stages such as foundations, damp-proof course and drains, and issue a completion certificate once they’re satisfied the work complies.
What happens if you ignore building regulations?
The consequences are serious and can surface years later:
- **Prosecution.** Contravening building regulations is an offence under section 35 of the Building Act 1984, with a fine or, on indictment, up to two years’ imprisonment.
- **Being made to alter or remove the work.** Under section 36 the council can require non-compliant work to be altered or taken down, and it can serve that notice up to 10 years after the work was completed.
- **Compliance and stop notices.** Since 1 October 2023 councils can serve notices requiring work to be put right within a set period, or stopping work altogether.
- **Problems when you sell.** Buyers’ solicitors routinely ask for completion certificates, and missing paperwork can delay or derail a sale.
Are building regulations changing?
Yes. The government published the Future Homes Standard on 24 March 2026, and the amending regulations take effect on 24 March 2027 for most building work, subject to transitional provisions. It mainly raises energy and carbon standards for new homes. Work on extensions and alterations continues to follow the current Approved Documents, so check with your designer or building control body which version applies when you submit.
Building regulations in Colchester and north Essex
Colchester City Council runs its own building control service. Its published charges from 1 April 2026 put a full plans application for an extension of 10 to 40 square metres at £925 including VAT (a £275 plan check plus £650 for inspections). Other councils and private approvers set their own fees, so compare quotes.
Frequently asked questions
Do building regulations apply to existing older homes?
Only to new building work. An older house doesn’t have to be upgraded to today’s standards, but any extension or alteration you carry out must comply, and some alterations can trigger upgrades to the parts you touch.
Who is responsible for complying, me or my builder?
Both. Your builder must carry out compliant work, but enforcement notices are served on the owner, so make sure your builder notifies building control and that you receive a completion certificate.
Can I start work while my full plans application is being checked?
You can start once you’ve given the required commencement notice, but any work that doesn’t match the eventual approval may have to be changed, so most people wait.
Do I need building regulations for a new kitchen or bathroom?
A like-for-like refit often doesn’t, but new drainage, electrical circuits, extraction or structural changes do. Ask your builder or building control before you start.
Planning an extension or renovation in Essex or Suffolk?
CJC Contracts is a Colchester-based building and groundworks contractor, established in 2007 and based in Great Horkesley, working across Essex and Suffolk. We build extensions, carry out renovations and work to building control inspections every week. Every project needs a site-specific quote, so request a free quote or call 01206 273689.
Sources
- GOV.UK: Building regulations and approved documents index
- Planning Portal: Full plans
- Planning Portal: Is building regulations approval needed for an outbuilding?
- legislation.gov.uk: Building Act 1984, section 36
- Building Safety Regulator: Regulating the building control profession
- Colchester City Council: Building control fees and charges