What Is Planning Consent? Consent, Permission and Approval Explained
October 21, 2026You get planning permission by submitting a complete, accurate application that fits your council’s planning policies and does not harm neighbours, the street scene or other protected interests. Most refusals trace back to a handful of avoidable mistakes, and the nine below are the ones worth checking before you apply.
If you are new to the process, start with our guide to how to get planning permission and the checklist in how to apply for planning permission.
1. Is your application complete?
Councils must be able to validate an application before they assess it. The Planning Portal lists the mandatory items: the application form, location plan, site plan, an ownership certificate, an agricultural holdings certificate, a design and access statement or fire statement where required, and the correct fee. Your council may add local requirements, so check its validation list. An incomplete or inaccurate application is a common cause of delay.
2. Did you ignore neighbours?
Impact on neighbours is among the most common planning grounds. PlanWatch lists loss of light, with councils applying the 45-degree rule, loss of privacy from new windows or raised platforms, overbearing visual dominance, and noise or traffic. Councils often look for around 21 metres between rear-facing habitable room windows. Talking to neighbours early means their concerns surface before the council hears them as objections.
3. Is the design out of keeping with the area?
Design and character grounds include materials that clash with the street, scale out of keeping with surrounding buildings and overdevelopment of the plot. Look at how nearby approved extensions were designed, because approved precedents nearby can support your case.
4. Have you overlooked parking and access?
Highway concerns include insufficient parking, dangerous access, extra traffic on unsuitable roads and poor visibility. Objections from the highway authority carry significant weight. If your plan changes the driveway or the entrance, see our groundworks service for what the construction involves.
5. Did you skip the local plan?
Policy conflicts can sink a scheme even if the drawings are good. Examples include building in the Green Belt without very special circumstances, developing in a flood zone without passing the sequential and exception tests, and breaching density or height limits. Read the council’s local plan policies for your site type, or ask the council in pre-application advice.
6. Did you leave out a survey or report?
Where a site raises ecology, flood, heritage or archaeological questions, the application usually needs a supporting survey or assessment. Missing ecological surveys, incomplete flood risk assessments and absent heritage assessments are all listed reasons for refusal.
7. Did you forget heritage?
Harm to a listed building or its setting, or to a conservation area, is a ground for refusal. Fences, outbuildings and extensions near listed buildings often need permission that would not be required elsewhere, as set out in our guide on when you need planning permission.
8. Did you skip pre-application advice?
Many councils offer a paid service where an officer comments on your proposal before you submit. It does not guarantee approval, but it lets you test ideas before commissioning detailed drawings and reports. PlanWatch’s guide points to skipping it as a missed opportunity.
9. Did you resubmit the same scheme?
Sending in essentially the same application after a refusal, without changes or new circumstances, is unlikely to succeed. Read the written reasons carefully and change what the council objected to.
A pre-submission checklist
Before you press submit, run through these questions. They are drawn from the Planning Portal’s list of mandatory documents and the common refusal grounds above.
- Do the plans show the site, its surroundings and the proposed development accurately and to scale?
- Have you completed the correct ownership certificate and, where relevant, given notice to owners or agricultural tenants?
- Have you checked the council’s own list of local validation requirements?
- Have you measured the effect on neighbours’ windows and gardens, not just your own?
- Does the proposal sit comfortably with nearby buildings in height, materials and scale?
- Is the fee correct for the type of application? The Planning Portal’s fee calculator will confirm it.
Does a refusal mean the project is dead?
Not necessarily. The council has to explain its reasons in writing, and those reasons tell you what to fix. Many applicants change the design, reduce the height or depth, add a survey the council said was missing, or move a window, and then apply again. The Planning Portal advises talking to planning staff about whether changes would make the proposal more acceptable, and notes that this route is often quicker than an appeal.
Does it help to build in stages or to start before permission arrives?
Starting work that needs permission before you have it risks enforcement action. Government guidance says an authority can invite a retrospective application, but it cannot be assumed that permission will be granted, and a person gets only one opportunity to seek permission after the event. It is far safer to wait for the decision notice, read the conditions and then book your builder. If you want a realistic start date, ask your contractor to build in time for conditions to be discharged.
What can’t a council refuse you for?
Councils may only consider genuine planning matters. According to PlanWatch, loss of property value, loss of a private view, competition from existing businesses, the applicant’s personal circumstances, boundary disputes, restrictive covenants and temporary construction disruption are not valid grounds. A refusal based on them can be overturned on appeal.
What if the application is refused?
The council must give written reasons. You can discuss the decision with the planning department, change the scheme and reapply, or appeal. For householder applications you have up to 12 weeks from the date of the decision letter, according to Gov.uk. Other appeals generally have six months from the decision letter. The Planning Portal describes appeals as a last resort that take several months, so talking to the council first may be quicker.
Frequently asked questions
How long does a decision take? The Planning Portal says you can appeal for non-determination if there is no decision within eight weeks, unless you agreed an extension in writing.
Can I appeal if the council does not decide? Yes. Once you appeal for non-determination, the application is out of the council’s hands.
Does building regulations approval replace planning permission? No, they are separate systems and a project can need both.
Should I use a professional? Local planning knowledge helps, so many applicants use an architect, planning consultant or technical designer.