CONSTRUCTION GUIDE · Drainage
Surface water drainage belongs at the start of the design
Published · Reviewed 17 September 2026

Rainwater does not respect the boundary between architecture and landscaping. A roof, driveway, courtyard and access road all contribute to the way water moves across a site. Leaving drainage until those features are fixed can force awkward compromises in levels, usable space and maintenance access.
Begin with the route water will take
Ask the drainage designer to consider the whole site, including water arriving from higher ground and the effect of altered levels. A new paved area may move a familiar puddle towards a doorway or neighbouring property. The design needs to address ordinary rainfall and the consequences when the system is exceeded or an inlet becomes obstructed.
Record where roof water, surface runoff and foul drainage go. They should not be combined by assumption simply because a nearby chamber is convenient. Confirm the proposed destination and any permissions or approvals before finalising the construction scope.
Choose a system that fits the ground
Infiltration, storage and controlled discharge solve different problems. A soakaway relies on suitable ground and site conditions; an attenuation system holds water before releasing it at a designed rate. Neither should be selected from the appearance of the surface alone. Site investigation and engineering input are needed to establish what will work.
The government’s national standards for sustainable drainage systems address how drainage should respond to site characteristics and manage water. They provide a useful reference for discussions with the designer, alongside the applicable planning and building control requirements.
Coordinate levels before construction
Thresholds, finished floor levels, falls in paving and cover levels should agree across the drawings. Small discrepancies can be difficult to correct once doors, slabs and drainage runs have been installed. A level-access threshold particularly needs a coordinated detail: visual continuity between inside and outside does not remove the need to manage water.
Discuss construction tolerances and how levels will be checked. If a drainage channel must sit beside a door, confirm its position, outlet, loading and maintenance access before the paving pattern is set out. Avoid designing each component in isolation and expecting the site team to reconcile the junction at the last moment.
Make maintenance part of the brief
A drainage system needs someone to look after it. Identify who will clear leaves and silt, inspect chambers and maintain planted areas. Provide practical access to inlets and outlets, and keep the relevant drawings and instructions at handover. A hidden component is not a maintenance-free component.
For a commercial site, include the facilities team in the design discussion. They can explain cleaning arrangements, vehicle movements and areas where access cannot easily be closed. For a home, choose features that suit the owner’s ability to maintain them rather than assuming specialist attention will always be available.
The best drainage conversation starts with the site’s behaviour and ends with a buildable, maintainable solution. CJC’s drainage construction service can be discussed alongside groundworks and external finishes so those interfaces are planned as one coordinated package.
Guidance reviewed on 17 September 2026. Requirements and suitable construction details depend on the property and project; follow the applicable regulations and your appointed specialists’ advice.