The St Albans project involved refurbishment and structural work within an older brick building. The expanded archive reveals the building's construction in detail: exposed roof timbers, altered openings, steel beams, stripped wall finishes and local work around the external levels.
This is a project where the retained fabric is central to the approach. Older buildings often contain changes made at different times, and opening-up can reveal construction that is not obvious from the finished rooms. The sequence needs to respond to those findings while preserving the elements intended to remain.
Opening up the existing fabric
The interior photographs show finishes removed to expose brickwork, timber framing and lath beneath damaged plaster. Some wall areas retain traces of earlier openings and repairs, giving a clearer picture of how the building has developed.
The purpose of controlled opening-up is to understand those interfaces before new work is fixed around them. Timber ends, bearings and masonry junctions can then be assessed where accessible. Removing more finish is not an end in itself; it creates the information and access required for the specified repairs or alterations.
Introducing structural support
Red steel beams appear within the roof and floor construction, supported at prepared positions in the retained walls. Temporary scaffolding and platforms provide access while the work is under way.
New steel in an existing building has to be coordinated with both its bearings and the construction it supports. Levels, connection details and the sequence of load transfer matter before the surrounding finishes are reinstated. The photographs show that structural work within the existing timber roof rather than presenting it as an entirely new frame.
Repairing masonry and altered openings
The external sequence includes openings at different stages, with close views of brickwork above and beside them. Retaining the character of the building requires attention to the bond, mortar and treatment of the junction between new and old masonry.
Where an opening is changed, its support and the stability of surrounding work need to be addressed before the visible edges are completed. Later windows and doors then rely on the dimensions and weathering details established during this stage.
Coordinating the external works
A new concrete route and local groundwork appear alongside the building, linking the refurbishment to its immediate surroundings. Finished external levels need to work with entrances and the retained walls, while access for the remaining construction has to be maintained.
The project sequence gives the St Albans project a substantial visual record. It follows the exposed structure, the new support and the masonry work closely enough to explain the practical decisions behind refurbishing an existing brick building.
For a similar project, find out about our building repairs and renovations in Essex and Suffolk.
ON SITE · IN DETAIL
Project gallery
Exposed fabric, structural alterations, masonry and external work.
26 photographs · Select a photograph to enlarge it.
01 / 26Enlarge
02 / 26Enlarge
03 / 26Enlarge
04 / 26Enlarge
05 / 26Enlarge
06 / 26Enlarge
07 / 26Enlarge
08 / 26Enlarge
09 / 26Enlarge
10 / 26Enlarge
11 / 26Enlarge
12 / 26Enlarge
13 / 26Enlarge
14 / 26Enlarge
15 / 26Enlarge
16 / 26Enlarge
17 / 26Enlarge
18 / 26Enlarge
19 / 26Enlarge
20 / 26Enlarge
21 / 26Enlarge
22 / 26Enlarge
23 / 26Enlarge
24 / 26Enlarge
25 / 26Enlarge
26 / 26Enlarge 