CONSTRUCTION GUIDE · Concrete structures
Lower-carbon concrete: start with the project decisions
Published · Reviewed 17 September 2026

Reducing the carbon impact of concrete involves more than selecting a product with a greener description. The quantity used, structural arrangement, specification, construction sequence and service life all matter. A useful discussion brings the designer, contractor and supplier together early enough for those choices to influence the project.
Ask what can be avoided or retained
Before comparing mixes, consider whether existing construction can be retained and whether the new structure uses material efficiently. This is an engineering question, not an instruction to reduce concrete or reinforcement arbitrarily. A smaller section may introduce other requirements, and the complete design must still meet its performance criteria.
The Concrete Centre’s discussion of sustainable concrete specification places material choices within a wider assessment of design, construction and whole-life performance. That is a more useful starting point than treating one ingredient as a complete environmental strategy.
Compare information on the same basis
Ask suppliers what their carbon figures cover. A value for producing a cubic metre of concrete is not the same as the footprint of a completed structural element, and production-stage data does not automatically include transport or site activities. The comparison needs consistent boundaries and the same required performance.
The Concrete Centre’s embodied-carbon guidance explains the role of Environmental Product Declarations. For a real project, request relevant evidence and have the design team interpret it. Avoid publishing a percentage saving without identifying the baseline, quantities and assumptions behind it.
Bring the programme into the conversation
Concrete choices can affect construction planning, including the rate at which required early strength is achieved. The relevant question is whether a proposed mix can satisfy the specification and the actual sequence under expected conditions. Discuss pour cycles, striking requirements and protection with the competent team rather than assuming every option is interchangeable.
A programme with room for considered decisions may create opportunities that a last-minute substitution cannot. Confirm availability with the supplying plant and agree how changes will be approved. A generic product brochure is not confirmation that a particular mix can be delivered to a particular site on the required date.
Keep durability and evidence in view
An environmental claim should not obscure exposure conditions, cover, workmanship or the intended life of the structure. Premature repair can undermine the benefit of an apparently attractive initial choice. Coordinate the specification and construction controls so the installed work achieves the design intent.
Maintain a record of the specified and supplied materials, quantities and any approved changes. If a client needs a project carbon assessment, establish the reporting method at the start. Reconstructing delivery data after completion is harder than collecting it through a planned process.
When discussing reinforced concrete structures with CJC, bring the carbon objectives alongside the structural and programme requirements. A clear target, credible data and early coordination make the conversation practical, measurable and relevant to the building being delivered.
Guidance reviewed on 17 September 2026. Requirements and suitable construction details depend on the property and project; follow the applicable regulations and your appointed specialists’ advice.