Before the concrete arrives: the checks that deserve time

Published · Reviewed 17 September 2026

Reinforcement mesh and spacers before a floor pour
Illustrative image.

Concrete placement can turn several weeks of preparation into a permanent structure within a few hours. Once the material is in place, reinforcement, service penetrations and many construction details are concealed. A planned pre-pour review gives the team a final opportunity to check the work against the design while it remains accessible.

Work from the current information

Confirm that the drawings, reinforcement schedules and agreed changes match. An updated opening on an architectural plan may not yet appear on a structural drawing. The team should resolve that discrepancy before the pour, with the designer’s instructions recorded and issued to the people carrying out the work.

Check the practical interfaces: cast-in channels, drainage sleeves, holding-down arrangements, waterstops where specified and construction joints. These items can be small compared with the slab or wall, but moving them later may require expensive remedial work or a redesign.

Check position as well as quantity

Reinforcement needs to be in the designed location and remain there during placement. The Concrete Society’s guidance on spacers and chairs explains their role in maintaining cover and supporting reinforcement during concreting. Having the correct steel on site is not enough if it is displaced as the pour proceeds.

Cover, laps, bar arrangements and supports should be checked against the project design, not a generic online dimension. Formwork also needs the planned line, level, stability and cleanliness. Record who has inspected each relevant part and how any outstanding item was closed out.

Plan the operation around the site

The delivery route, pump or discharge position, working access and placing sequence should be agreed before vehicles arrive. Check whether neighbouring operations will obstruct access and how weather may affect the work. Consider the point at which a delivery delay becomes a technical issue requiring advice rather than an inconvenience to work around informally.

Agree the concrete specification, delivery checks, testing arrangements and responsible personnel. Changes to the ordered material or site adjustments should follow the authorised process. The team needs a clear contact route if a delivery does not match the specification or if conditions differ from those expected.

Prepare for the hours after placement

Finishing, curing and protection are part of the same operation. Have the required materials and access restrictions ready before the pour starts. Decide how the new work will be protected from rain, rapid moisture loss and damage by following trades, as appropriate to the specification and conditions.

Photographs can make a useful record of reinforcement and embedded items, particularly when their location is clear. They complement, rather than replace, inspection and test records. Store the information by pour or element so it can be retrieved later without relying on someone’s phone gallery.

Discuss formwork and reinforcement work with CJC as a coordinated package. A realistic programme includes time for review and correction before concrete arrives, because the best moment to resolve a concealed detail is while it is still visible.

Guidance reviewed on 17 September 2026. Requirements and suitable construction details depend on the property and project; follow the applicable regulations and your appointed specialists’ advice.