Ground investigation: what to establish before designing foundations
Published · Reviewed 17 September 2026

The ground beneath a building is part of its structure, even though it disappears from view once the work is complete. A foundation solution that suits one plot may be inappropriate next door. The purpose of early investigation is to replace assumptions with enough reliable information for the engineer to choose and detail a suitable approach.
Ask a specific question of the investigation
Start with the proposed building and the information already available. Previous site uses, nearby structures, historical alterations and visible levels all help shape the investigation brief. An engineer may need information about bearing conditions, made ground, groundwater, existing footing geometry or the influence of trees. Different questions may require different investigation methods.
Avoid specifying a trial pit merely because another project had one. Agree what needs to be established, who will interpret the findings and what report or record is required. The value lies in the information and its use in design, rather than the amount of soil removed.
Plan access and excavation safety
Investigations themselves are construction work. Buried services, nearby walls and restricted access must be considered before digging. HSE identifies collapse, water ingress, falls and undermining adjacent structures among the principal excavation risks, and requires suitable precautions and competent inspections. See its excavation safety guidance.
A trial pit beside an existing wall should therefore be planned by the relevant competent team. It is not an invitation for a homeowner to excavate below a footing. Arrange safe working space, spoil management and reinstatement as part of the investigation rather than leaving these as afterthoughts.
Connect the findings to the design
Ask for a clear explanation of what the investigation changes. Does it support the initial foundation concept, require more information or introduce a different construction method? Where results are limited to particular locations, the designer should explain the remaining uncertainty. Conditions discovered during the main excavation may still need review.
For an extension, the relationship with the existing building matters as much as the new foundations in isolation. Levels, movement, drainage and the sequence of forming the connection should be coordinated. Where trees or neighbouring structures influence the design, retain the assumptions in the project records so that later changes can be assessed properly.
Build a response into the programme
Before excavation begins, agree who must inspect the formation and who can authorise a design change. Establish how unexpected ground will be recorded and priced. A builder should not be left waiting for an answer while an open excavation deteriorates, and concrete should not be ordered on the assumption that every discovery will match the drawing.
A practical pre-start pack combines the investigation report, engineering drawings, relevant service information and a clear inspection sequence. It also states what would trigger further advice. This allows cost and programme discussions to reflect identified risks instead of using a vague contingency as a substitute for investigation.
CJC’s groundworks service covers the construction work that follows a coordinated design. Bringing site logistics and buildability into the discussion early helps the investigation answer the questions that matter on the ground.
Guidance reviewed on 17 September 2026. Requirements and suitable construction details depend on the property and project; follow the applicable regulations and your appointed specialists’ advice.