PROJECT STORIES · GROUNDWORKS

Brentwood: concrete steps and external groundwork

From the CJC project archivePublished

Brentwood — concrete steps and external groundwork

The Brentwood entrance works brought new concrete steps and a long adjoining concrete edge into a space between red-brick buildings. The construction sequence follows the timber formwork and surrounding groundwork through to the stripped concrete, making the construction of the entrance much easier to understand.

Steps are visually compact, but they bring several dimensions together at once. The individual rises, tread depths, landings and adjacent ground all have to resolve against the building entrance. That is why setting out is central to the work, even before any concrete is placed.

Establishing the entrance geometry

The early photographs show the prepared ground and the line of the supporting concrete beside the building. This establishes the relationship between the entrance level and the space beyond. The long straight edge also gives the surrounding groundwork a defined boundary.

At this stage, the intended finish needs to be considered alongside the structural concrete. Any later paving or covering will affect the final levels. Coordinating those allowances before forming the steps helps prevent an irregular first or last rise once the adjoining surfaces are completed.

Building the formwork

Timber shutters reproduce the stepped profile and retain the concrete during placement. Their alignment determines the shape left behind after striking. Bracing and support are particularly relevant around the risers, where wet concrete presses against several small faces rather than one continuous edge.

The forms also need to leave a workable placing and finishing sequence. Each part of the staircase has to be filled and consolidated without disturbing the geometry of the adjacent step. The photographs taken during this stage explain the practical work behind the clean lines of the later concrete.

Removing the shutters and preparing the next stage

Later views show the concrete steps exposed, with the surrounding site still being worked. A spirit level rests across the top, and the adjoining edge continues towards the building. These views record the completed concrete stage rather than a fully landscaped entrance.

The following work would bring the surrounding levels and any specified finishes into alignment with the new steps. This sequence illustrates how a relatively small concrete package influences a much larger entrance area: its accuracy sets the reference for the paving, landings and access route around it.

For a similar project, find out about our groundworks in Essex and Suffolk.