The attenuation tank installation at Colchester Hospital records a part of the drainage system that would normally disappear completely beneath the finished site. Modular storage crates are arranged within a prepared excavation, with a lining carried around the installation before backfilling.
Although the archive contains only four photographs of this stage, they show the essential relationship between the excavation, the crate assembly and the surrounding material. The construction is below ground, but its purpose is connected to the way the finished development manages rainfall.
Creating storage below the surface
An attenuation system temporarily stores surface water so that discharge can be managed through the drainage design. The modules create a large void within an assembly that can be buried, allowing the area above to return to the wider site layout once the installation is complete.
The required capacity, cover and flow-control arrangement depend on the design for the particular site. Those values cannot be established from the photographs. What is visible here is the modular construction and the care needed to fit it within the available excavation without damaging the surrounding lining.
Preparing and assembling the installation
The base of an installation like this needs to provide even support to the modules. Assembly then follows the specified layout, with the lining and connections coordinated as the work progresses. Creases, unprotected contact points and disturbed bedding are easier to address while the excavation remains open.
The close views show the narrow working space at the edges. That makes the construction order especially relevant: materials and connections need to be accessible at the right moment, and the assembly needs to be checked before the next layer conceals it.
Closing up the excavation
Once the tank assembly and drainage connections are ready, the following operation is to protect and surround the installation with the specified material, then reinstate the ground above in a controlled sequence. The loads applied during that process must be compatible with the system and its cover.
The tank becomes part of the site's buried drainage infrastructure. The excavation, lining, crate assembly and connections all need to be coordinated before backfilling conceals them. Recording those stages makes the scale of the drainage work clear and shows the preparation on which the later external surfaces depend.
Planning work of your own? Read more about our drainage installation and repairs in Colchester.
ON SITE · IN DETAIL
Project gallery
Project setting, working details and the construction stages available in the archive.
4 photographs · Select a photograph to enlarge it.