Skip to content

CJC CONTRACTS · COLCHESTER, ESSEX

Trial holes for foundation investigations in Essex & Suffolk

Open up the right area.
Inform the next decision.

CJC Contracts carries out trial-hole excavation to expose agreed foundation locations for inspection across Essex and Suffolk. This enabling work can help an appointed engineer or surveyor establish what is present beside an existing building before an extension or alteration is developed. We discuss the excavation locations, access, inspection arrangements and making good as one defined package.

Share your plans, photographs and site postcode.
We’ll discuss the work and the next useful step.

Local excavation beside an existing wall during a CJC foundation investigation
Opening up beside existing masonry — CJC foundation investigation
Established 2007Based in ColchesterReal project photographsWorking across Essex & Suffolk

THE WORK YOUR PROJECT NEEDS

Find out what is there
before the next stage.

Drawings of an older building do not always record the construction below ground, and the visible wall tells only part of the story. An appropriately located trial hole can give the project’s engineer an opportunity to inspect an exposed foundation and nearby ground. The information needed determines where and how the opening is made. CJC provides the excavation work to the agreed brief, with the designer or investigating professional directing what needs to be exposed and interpreting the findings.

01

Foundation exposure

Excavate the agreed location beside an existing wall so the relevant foundation detail can be inspected. Establish the limits and method before starting, particularly where the excavation is close to retained structures or services.

02

Opening up for proposed alterations

Coordinate trial holes with an extension or structural alteration brief. Discuss access through gardens or occupied properties, protection of retained surfaces and the inspection information required before the main construction is priced.

03

Inspection access and reinstatement

Arrange the excavation around the inspection visit and the agreed recording requirements. Confirm how the opening is protected, when it can be backfilled and which paving, soil or other surfaces will be reinstated afterwards.

Foundation investigation opening immediately beside retained brickwork
Agreed opening beside a retained wall — CJC project archive

FROM CJC’S PROJECT ARCHIVE

Small excavations.
Useful project information.

The CJC foundation-investigation archive records local openings beside an existing wall. These are investigation works rather than a completed foundation replacement. The purpose of this kind of opening is to make a concealed detail accessible to the appointed professional, who can assess what it means for the proposed construction. The project photographs show the practical excavation context without claiming that one opening establishes the condition of an entire building.

  • Locations and exposure requirements agreed with the engineer
  • Known service information and retained structure constraints
  • Access, surface protection and spoil handling
  • Inspection timing and any requested measurements or photographs
  • Backfilling and reinstatement agreed before excavation

View the CJC foundation-investigation photographs

HOW THE WORK COMES TOGETHER

Agree the brief.
Coordinate the inspection.

Agree the scope, construction information and practical arrangements before the work starts.

  1. 01 / THE NEXT STEP

    Establish the investigation brief

    Send the site postcode, photographs and the engineer’s requested locations and details. Explain the proposed project and provide any drawings or existing service information available.

  2. 02 / THE NEXT STEP

    Plan the opening and inspection

    Confirm the excavation scope, access, protection and spoil arrangements. Coordinate the inspection appointment so the exposed area can be reviewed before the agreed backfilling and making good.

  3. 03 / THE NEXT STEP

    Excavate, inspect and reinstate

    Open the agreed area within the specified limits and make it available for inspection. Record the requested details, then backfill and reinstate in accordance with the agreed instructions.

SCOPE & COSTS

Price the work
your site needs.

Send your plans and details of the foundation trial-hole excavation you have in mind. We’ll review what needs to be included and what information is still needed.

Request a quotation

What influences the cost?

The number and position of trial holes, surface type, access and required depth all affect the excavation package. A garden opening differs from one reached through a paved courtyard or confined side passage. Spoil removal, protection, inspection coordination and the extent of reinstatement also influence cost. Ask the investigating professional to define the required exposure before requesting prices. If conditions differ from the brief, further excavation should be discussed and agreed rather than simply enlarging an opening beside a building.

Separate excavation from the technical assessment

The engineer or appointed investigating professional should establish what needs to be exposed and assess the findings. Excavation is not a structural report, soil classification or foundation design. Tell us about known services, previous alterations and any concerns identified by the project team. The method and extent of work need to suit the retained building, and additional support or specialist investigation may be required if the agreed exposure cannot be achieved safely. Establish those responsibilities before the visit.

BASED IN GREAT HORKESLEY

Local projects.
Connected services.

Based in Great Horkesley, Colchester, CJC considers foundation trial-hole excavation across Essex and Suffolk. Share the investigation brief and property details so we can discuss the practical work and its coordination with your engineer or surveyor.

Explore the related work that may form part of your project:

Explore all services

BEFORE YOU BEGIN

Your questions,
answered.

Have something specific in mind?
Call 01206 273689

Do you provide the engineer’s report?

This service covers the agreed excavation and associated work. The appointed engineer or surveyor carries out the technical assessment and provides any report or recommendations required for your project.

Who chooses the trial-hole positions?

Positions and the required exposure should be agreed with the professional directing the investigation. Send their brief or marked-up drawing so the excavation is targeted at the information needed.

Will the opening be left exposed?

Agree the inspection and backfilling sequence before work starts. Any period when an opening remains exposed needs appropriate protection and clear responsibility for the area.

Can you quote for the extension afterwards?

Yes, the wider construction package can be discussed once the design and scope are sufficiently developed. The investigation findings may help the designer resolve details needed for a meaningful construction quotation.

LET’S DISCUSS YOUR PLANS

Discuss your trial-hole excavation.

Tell us about your foundation trial-hole excavation so we can discuss the site, scope and proposed timing.

01206 273689

CJC Contracts · Great Horkesley, Colchester
Building and construction since 2007.

Useful to include

Property postcode, engineer’s brief, marked investigation locations, photographs, service information and required inspection timing.

Request a quotation

Fields marked * are required.

    We use your details to respond to your enquiry. Read our Privacy Policy. Please do not send sensitive personal information.

    We use your details to respond to your enquiry. Privacy Policy.