New pedestrian paths
Defined concrete routes with an agreed layout, preparation, finish and relationship to the surrounding ground.
CJC CONTRACTS · COLCHESTER, ESSEX
Create a usable route.
Connect the levels carefully.
CJC Contracts builds and repairs concrete paths around homes and commercial premises across Essex and Suffolk. We review the route, existing ground and adjoining entrances before agreeing preparation, concrete work and local reinstatement.
Share your plans, photographs and site postcode.
We’ll discuss the work and the next useful step.

THE WORK YOUR PROJECT NEEDS
The end of a path matters as much as the straight section. Door thresholds, steps, drainage points and adjoining paving determine the finished levels and how the route will be used. We consider those connections alongside the path specification, including where a repair should stop and sound existing concrete can remain.
Defined concrete routes with an agreed layout, preparation, finish and relationship to the surrounding ground.
Replacement of damaged sections where appropriate, with the condition of retained concrete and the likely cause of movement reviewed.
Path work coordinated with entrances, drainage and adjacent paving so the completed route has clearly resolved junctions.

FROM CJC’S PROJECT ARCHIVE
The Hornbry project archive records concrete path work and local reinstatement in Southend. The photographs show the route alongside existing entrances and surrounding surfaces. They are real examples of the detailed junctions that need attention in a path repair.
HOW THE WORK COMES TOGETHER
Agree the scope, construction information and practical arrangements before the work starts.
Show us the path, entrances, damaged sections and any recurring water issues.
Define new and retained areas, preparation, finish and drainage interfaces.
Carry out the agreed concrete work and establish when the route can reopen.
SCOPE & COSTS
Send your plans and details of the concrete path you have in mind. We’ll review what needs to be included and what information is still needed.
Request a quotation ↗Length and width, preparation depth, access and disposal affect cost. Short sections with several changes in level or awkward entrances may involve more detail than a simple straight run. The quotation should identify joints, finish and any adjoining surface repairs.
Fresh concrete and excavation can temporarily close an entrance route. Tell us if this is the only way into a building or if particular access needs must be accommodated. Agree the alternative route and protection arrangements before the work begins.
BASED IN GREAT HORKESLEY
Based in Great Horkesley, Colchester, CJC considers concrete path projects across Essex and Suffolk. Send the site postcode and scope so we can discuss access, the work involved and a suitable programme.
Explore the related work that may form part of your project:
We can review a local repair. The surrounding concrete, underlying ground and cause of damage help determine where the replacement should begin and end.
Yes, the levels and junction need to be agreed so the two surfaces connect properly and water is directed as designed.
Share the existing levels and how the route needs to be used. Changes may need a designed layout, particularly where accessibility requirements apply.
That depends on the concrete specification, conditions and intended use. Reopening and protection should be agreed as part of the construction plan.
LET’S DISCUSS YOUR PLANS
Tell us about your concrete path so we can discuss the site, scope and proposed timing.
01206 273689CJC Contracts · Great Horkesley, Colchester
Building and construction since 2007.
Site postcode, route dimensions, entrance photographs, damaged sections and access requirements.
Fields marked * are required.
We use your details to respond to your enquiry. Privacy Policy.