Skip to content

CJC CONTRACTS · COLCHESTER, ESSEX

Building strip-out contractors in Essex & Suffolk

Clear the agreed scope.
Prepare for what comes next.

CJC Contracts undertakes building strip-out and defined selective demolition within suitable refurbishment projects across Essex and Suffolk. We review what is to be removed, what must stay and the condition required for the following trades before agreeing the work package.

Share your plans, photographs and site postcode.
We’ll discuss the work and the next useful step.

Industrial interior during strip-out preparation in Chelmsford
Industrial strip-out preparation — Chelmsford
Established 2007Based in ColchesterReal project photographsWorking across Essex & Suffolk

THE WORK YOUR PROJECT NEEDS

Mark the boundaries
before removal begins.

A successful strip-out leaves the right parts of the building ready for reuse. The scope needs to identify retained finishes, structure, live services and neighbouring occupied areas. Surveys and design information should establish what can be removed and which elements require specialist assessment or a designed temporary support sequence.

01

Internal strip-out

Removal of agreed fittings, finishes and non-structural elements, coordinated with service isolation and protection of retained areas.

02

Selective building removal

Defined removal within an alteration project, following the necessary structural information and sequence where load-bearing elements are affected.

03

Preparation for refurbishment

Strip-out alongside making good and subsequent building work, with a clear handover condition for the next stage of the project.

Brick exterior of the industrial building recorded before strip-out in Chelmsford
Existing industrial building — Chelmsford

FROM CJC’S PROJECT ARCHIVE

An industrial building
before its next use.

CJC’s Chelmsford industrial strip-out archive shows the building exterior and an internal space during preparation. The photographs record the existing fabric and work area, helping illustrate the starting conditions that a refurbishment package needs to address.

  • Removal drawings and a clear retention schedule
  • Building surveys relevant to the proposed work
  • Service identification and isolation responsibilities
  • Structural and temporary support information
  • Waste handling, access and handover condition

Chelmsford: demolition and strip-out preparation

HOW THE WORK COMES TOGETHER

Define the work.
Plan each stage.

Agree the scope, construction information and practical arrangements before the work starts.

  1. 01 / THE NEXT STEP

    Define removal and retention

    Walk through the proposed work and identify the building elements that must stay.

  2. 02 / THE NEXT STEP

    Resolve surveys and sequence

    Establish required information, service isolation and any specialist work before starting.

  3. 03 / THE NEXT STEP

    Strip out and prepare

    Complete the agreed removal, clearance and making good for the following construction stage.

SCOPE & COSTS

Price the work
your site needs.

Send your plans and details of the building strip-out you have in mind. We’ll review what needs to be included and what information is still needed.

Request a quotation

What influences the cost?

The extent of removal, building access, material types and waste handling affect cost. Retaining occupied areas or protecting delicate existing fabric can change the sequence. Specialist surveys, hazardous-material work and structural support should each have a defined responsibility and allowance.

Surveys and isolation come before removal

Establish the appropriate asbestos and other building information for the proposed works before disturbing materials. Live services need identification and the necessary isolation by competent parties. Specialist hazardous-material removal is a separately defined responsibility and should not be assumed within a general strip-out quotation.

HSE guidance on asbestos surveys

BASED IN GREAT HORKESLEY

Local projects.
Connected services.

Based in Great Horkesley, Colchester, CJC considers building strip-out projects across Essex and Suffolk. Send the site postcode and scope so we can discuss access, the work involved and a suitable programme.

Explore the related work that may form part of your project:

Explore all services

BEFORE YOU BEGIN

Your questions,
answered.

Have something specific in mind?
Call 01206 273689

Can strip-out be included in a refurbishment?

Yes. We can review removal and subsequent building work together so the scope and handover between stages are clear.

Can you remove load-bearing walls?

Structural removal needs the appropriate design and temporary support information. Share the drawings so the work and responsibilities can be assessed.

Does the service include asbestos removal?

Do not assume it does. Survey requirements and any specialist removal must be identified before the general strip-out package is agreed.

Can part of the premises remain occupied?

That depends on separation, access, noise, services and the work involved. Tell us which areas must remain operational when discussing the programme.

LET’S DISCUSS YOUR PLANS

Discuss your strip-out project.

Tell us about your building strip-out so we can discuss the site, scope and proposed timing.

01206 273689

CJC Contracts · Great Horkesley, Colchester
Building and construction since 2007.

Useful to include

Site postcode, building use, removal drawings, survey information and details of areas that must remain occupied.

Request a quotation

Fields marked * are required.

    We use your details to respond to your enquiry. Read our Privacy Policy. Please do not send sensitive personal information.

    We use your details to respond to your enquiry. Privacy Policy.