Skip to content

CJC CONTRACTS · COLCHESTER, ESSEX

Attenuation tank installation in Essex & Suffolk

Make space for rainfall.
Build to the drainage design.

CJC Contracts installs specified surface water attenuation systems as part of drainage and civil engineering packages across Essex and Suffolk. We review the tank arrangement, excavation, connections and surrounding construction against the drainage designer’s and system supplier’s information.

Share your plans, photographs and site postcode.
We’ll discuss the work and the next useful step.

Modular attenuation crates in a lined excavation at Colchester Hospital
Attenuation tank installation — Colchester Hospital
Established 2007Based in ColchesterReal project photographsWorking across Essex & Suffolk

THE WORK YOUR PROJECT NEEDS

Storage is one part
of a complete drainage system.

An attenuation tank needs to work with the site drainage network, the designed outlet and the loads above it. Tank size and discharge arrangements come from the drainage design. Our construction review focuses on how that specified system can be installed, protected and connected within the site programme.

01

Attenuation system installation

Assembly and installation of the specified system, with the product, layout and associated details confirmed before procurement and excavation.

02

Excavation and preparation

The defined below-ground construction work, considering excavation stability, ground conditions, working space and the required formation.

03

Drainage and reinstatement

Associated pipework and external works where included, with maintenance points and the system’s relationship to finished surfaces retained.

Connected attenuation storage units inside an excavation at Colchester Hospital
Surface-water storage units — Colchester Hospital

FROM CJC’S PROJECT ARCHIVE

Actual attenuation work
at Colchester Hospital.

CJC’s Colchester Hospital project archive includes photographs of an attenuation system under construction. The images show the modular units within the excavated area and the installation before backfilling. They provide direct project evidence for this service.

  • Drainage design, storage volume and outlet details
  • Specified system and supplier installation information
  • Ground conditions and excavation support requirements
  • Cover levels and anticipated surface loading
  • Inspection, maintenance and handover requirements

Colchester Hospital: attenuation tank installation

HOW THE WORK COMES TOGETHER

Define the work.
Plan each stage.

Agree the scope, construction information and practical arrangements before the work starts.

  1. 01 / THE NEXT STEP

    Review the specified system

    Send the drainage layout, tank details and available ground information.

  2. 02 / THE NEXT STEP

    Plan the construction

    Coordinate excavation, deliveries, installation stages and connections.

  3. 03 / THE NEXT STEP

    Install and hand over

    Complete the defined system and agreed records before the surrounding work is finished.

SCOPE & COSTS

Price the work
your site needs.

Send your plans and details of the attenuation tank installation you have in mind. We’ll review what needs to be included and what information is still needed.

Request a quotation

What influences the cost?

Storage volume, installation depth, ground conditions and access are major cost factors. Product choice, excavation support, groundwater management, connections and reinstatement also affect the package. A budget based only on tank capacity can miss substantial site work.

Attenuation and infiltration are different design choices

The project designer must establish how water is stored and where it ultimately goes. Do not assume a tank can act as a soakaway or that a standard detail suits every site. Installation should follow the selected system’s requirements and the approved project information.

BASED IN GREAT HORKESLEY

Local projects.
Connected services.

Based in Great Horkesley, Colchester, CJC considers attenuation tank installation projects across Essex and Suffolk. Send the site postcode and scope so we can discuss access, the work involved and a suitable programme.

Explore the related work that may form part of your project:

Explore all services

BEFORE YOU BEGIN

Your questions,
answered.

Have something specific in mind?
Call 01206 273689

Do you choose the tank capacity?

Capacity and discharge requirements need to be established by the appointed drainage designer. We review construction from that information.

Can you include excavation and connections?

Yes, those elements can be considered within the package. State the work needed and which parts of the drainage network are supplied by others.

Can a tank sit beneath a trafficked area?

That depends on the specified system, cover and design loading. The supplier and designer must confirm the detail for the proposed location.

Do you have a real project example?

Yes. The photographs and linked Colchester Hospital project record show attenuation-system construction undertaken by CJC.

LET’S DISCUSS YOUR PLANS

Discuss your attenuation system.

Tell us about your attenuation tank installation so we can discuss the site, scope and proposed timing.

01206 273689

CJC Contracts · Great Horkesley, Colchester
Building and construction since 2007.

Useful to include

Site postcode, drainage design, tank specification, ground information and proposed installation programme.

Request a quotation

Fields marked * are required.

    We use your details to respond to your enquiry. Read our Privacy Policy. Please do not send sensitive personal information.

    We use your details to respond to your enquiry. Privacy Policy.