When Are Building Regs Required? The Jobs That Need Sign-Off
November 1, 2026
Are Building Regs a Legal Requirement? What Happens If You Ignore Them
November 2, 2026A building notice application is the quicker of the two main ways to get building regulations approval from your council. You give building control notice of the work, usually with a block plan and the fee, and you can start two days later. Unlike a full plans application, no detailed drawings are checked or approved in advance: the building control surveyor checks the work as it’s built instead.
That speed comes with a catch. If an inspector finds something that doesn’t comply, you may have to put it right even if it’s already been built. A building notice is also limited to residential work and can’t be used near a public sewer, on buildings covered by fire safety law, or for a new building fronting a private street. Here’s how it works and how it compares with full plans.
How does a building notice application work?
The Planning Portal describes the building notice as quicker and less detailed than a full plans application, because plans aren’t required. The usual steps are:
- Submit the notice and fee. For a new building or extension, councils such as Chelmsford ask for a block plan at a scale of at least 1:1,250 showing the building’s size and position, the boundaries, other buildings on the plot, nearby streets and the drainage.
- Give notice before you start. You can begin work two days after the notice has been submitted. Chelmsford asks you to give notice of your start after the building notice has been validated and at least two days before work begins.
- Provide more detail if asked. The council can ask for further information, such as structural design calculations or plans, before work starts or while it’s under way.
- Call for inspections. Building control inspects key stages such as foundations, damp-proof courses and drains.
- Notify completion. Cherwell District Council asks you to tell it within five days of finishing. After a satisfactory final inspection, the council issues a completion certificate automatically.
A building notice is valid for three years from the date it was given to the council. If work hasn’t started by then, it lapses automatically. Our guide How Long Do Building Regs Last? explains what counts as starting work.
When can’t you use a building notice?
Councils set out the same restrictions. According to Chelmsford City Council and Cherwell District Council, you need a full plans application instead if:
- the building is covered by the Regulatory Reform (Fire Safety) Order 2005, which Chelmsford says includes all non-domestic properties and flats that share a common staircase, lobby or corridor
- you’re putting up a building that fronts onto a private street
- the work is within 3 metres of a public sewer
- the work isn’t residential (Cherwell says a building notice can’t be used for any non-residential work)
Higher-risk buildings (at least 7 storeys or 18 metres high with two or more homes, or a hospital or care home of that height) go to the Building Safety Regulator rather than the council, so neither route applies. A building notice is also a council procedure: if you use a private registered building control approver, they work through their own process rather than a building notice.
The sewer rule catches out more extensions than people expect, because many back gardens have a shared or public sewer running close to the house. Chelmsford strongly recommends contacting Anglian Water if your work is near a sewer, even when a building notice can be used. Our guide How Much Does Building Regulations Cost? includes Anglian Water’s build-over charges.
Building notice vs full plans: what’s the difference?
| Building notice | Full plans | |
|---|---|---|
| Plans checked before work? | No | Yes, approved or rejected |
| When can work start? | Two days after giving notice | After two days’ notice, though most wait for approval |
| Decision time | No plan decision | Five weeks, or up to two months if you agree |
| Who can use it? | Residential work only, with restrictions | Most building work |
| If work doesn’t start | Lapses after three years | Lapses if work hasn’t started within three years |
| Protection if built to the plans | None | Council can’t serve a section 36 notice for contraventions |
| Completion certificate? | Yes, after final inspection | Yes, after final inspection |
The protection row matters. Under section 36 of the Building Act 1984, as amended for England from 1 October 2023, where an application for building control approval has been granted and the work is carried out in line with the approved plans and any requirements imposed, the council can’t serve a section 36 notice on the ground that the work contravenes the building regulations. A building notice gives you no approved plans to rely on. For how full plans decisions and approvals work, see What Is Building Regulation Approval and How Long Does It Take?
Is a building notice cheaper than full plans?
Not necessarily. Colchester City Council’s schedule, for example, shows the same total for a building notice as for full plans. With full plans that total is split into a plan check charge paid with the application and an inspection charge once work starts; with a building notice, councils such as Chelmsford usually take the fee with the submission. Fees vary by council and project size, so check the current schedule for your area.
The bigger cost difference usually comes later. If an inspector asks for a deeper foundation, a larger steel beam or a change to the drainage once work has started, the cost of redoing work falls on the project. With full plans, those questions are normally settled on paper before anyone digs.
Which route should you choose?
The Planning Portal says a building notice is “perhaps best suited to small work” and is often used where the regulations are less complex. It also warns that you need to be confident the work will comply, or you risk having to correct it if the council asks.
As a rough guide, a building notice can suit:
- small, straightforward single-storey extensions to a house, well away from public sewers
- internal alterations to a house where the structural design is already done
- jobs where your builder has a strong track record with the council’s surveyors
Full plans are usually the safer choice for:
- larger or two-storey extensions, loft conversions and new homes
- anything involving complex structure, steelwork or difficult ground
- projects where you want fixed, approved drawings to price against and build from
- any work that falls within the restrictions above
Building notices in Essex and Suffolk
Councils in Essex and Suffolk accept building notices for domestic work within the national restrictions, but their submission systems differ. Chelmsford City Council says it will only accept electronic submissions using Submit-a-Plan from 1 December 2026. Colchester City Council publishes its own building control charges, including building notice fees. Anglian Water handles public sewers across most of the region, so if your extension is close to a public sewer, plan for its consent alongside building regs.
Frequently asked questions
Do you get a completion certificate with a building notice?
Yes. The Planning Portal says that on satisfactory completion the council will automatically issue a completion certificate, provided you’ve let building control inspect the work.
How long does a building notice last?
Three years from the date it was given to the council. If work hasn’t started within that time, it lapses automatically.
Can I use a building notice for a loft conversion?
Possibly, if it’s a house and none of the restrictions apply. But you’re likely to be asked for structural calculations, and many homeowners prefer full plans for the certainty of approved drawings before the roof is opened up.
Can I use a building notice for work to a flat?
Not if the flat shares a common staircase, lobby or corridor with other flats, because those buildings are covered by the Regulatory Reform (Fire Safety) Order 2005. You’ll need full plans.
Can I use a building notice if I’ve already started work?
No. A building notice has to be given before you start. For work already carried out without approval, the council’s route is a regularisation application. See When Are Building Regs Required? for which jobs need sign-off.
Planning a building project?
CJC Contracts is a Colchester-based building and groundworks contractor, established in 2007 and based in Great Horkesley, working across Essex and Suffolk. We build extensions and carry out the groundworks and drainage that building control inspects first. Every project needs a site-specific quote, so request a free quote or call 01206 273689.