October 31, 2026Council building control fees for a typical home project run to several hundred pounds, rising to over £1,000 for larger extensions, loft conversions and new homes. At Colchester City Council, for example, an extension of 10 to 40 m² currently costs £925 including VAT, a loft conversion £1,075 and a garage conversion £650.
Each council sets its own charges to cover its costs, and private building control approvers quote their own prices, so fees vary from area to area. The bigger surprises tend to be the extras around the fee: detailed drawings, structural calculations, drainage agreements and putting right anything an inspector won’t accept.
How are building regulations fees worked out?
Council building control teams base their charges on the cost of providing the service, such as checking plans and inspecting work on site. Fees depend on the type of work, the number of homes and, for extensions, the total floor area. If you use a private registered building control approver instead, you agree the fee directly with them. You may not have to pay a fee for work carried out solely for a disabled person.
With a full plans application the charge is usually split in two: a plan check fee when you submit your drawings and an inspection fee before the first site visit. A building notice is normally a single combined charge.
How much does building control cost in Colchester?
Colchester City Council’s current schedule of charges gives these figures for common domestic jobs, all including VAT:
| Type of work | Plan check | Inspection | Full plans total |
|---|---|---|---|
| Extension up to 10 m² | £275 | £290 | £565 |
| Extension over 10 m² and up to 40 m² | £275 | £650 | £925 |
| Extension over 40 m² and up to 100 m² | £275 | £880 | £1,155 |
| Loft conversion | £275 | £800 | £1,075 |
| Garage conversion | £275 | £375 | £650 |
| Garage, carport or store up to 100 m² | £275 | £435 | £710 |
| Windows, rooflights, glazed doors or renovating a thermal element (work up to £25,000) | £275 | £70 | £345 |
| New single dwelling | £440 | £685 | £1,125 |
The building notice charge for each of these is the same as the full plans total. Where a project falls into more than one fee category, such as an extension and a loft conversion at the same time, the council applies a 50% reduction to the additional categories. These figures were checked in October 2026 and can change, and other councils in Essex and Suffolk publish their own schedules, so always check the one for your area.
Is a full plans application or a building notice cheaper?
In Colchester the fee is the same either way. The real difference is risk. A full plans application gets a decision within five weeks, or two months if you agree to longer, so problems are caught on paper before anyone digs a trench. With a building notice you can start two days after submitting, but you have no formal approval of your plans. If the inspector asks for changes on site, you pay for the rework.
For extensions with steel beams, new foundations or drainage alterations, full plans is usually the safer route. Our guide to what building control is explains how inspections and notices work.
What hidden extras should you budget for?
The building control fee is rarely the largest cost of getting a project signed off. Allow for:
- Building regulations drawings: these are more detailed than planning drawings, showing structure, insulation, drainage and fire safety.
- Structural calculations: usually needed for steel beams, removed walls, new foundations and most loft conversions.
- Build-over agreements: if an extension sits over or close to a public sewer, the water company’s approval may be needed. Anglian Water’s 2026–27 charges are £163 for a build over or build near consultation and £692 for its full service, plus VAT where payable.
- Work found at inspection: if foundations need to go deeper, or insulation or fire protection falls short, the cost of putting it right isn’t covered by any fee.
- Regularisation: getting unapproved work signed off later can mean opening up floors, walls or foundations, on top of the council’s charge.
- Party wall costs: a separate law from building regulations, but often triggered by the same extension.
Electricians, window fitters and heating engineers registered with a competent person scheme can self-certify their own work and notify the council, so that part of the job doesn’t need a separate building control application. Their certificate should arrive within eight weeks of the work being finished.
Can you avoid paying for building regulations?
Not legally, if the work needs approval. If building work doesn’t comply, the person who did it can be prosecuted and fined, the council can make you pay to put faulty work right, and you may not have the certificates you need when you sell. Our guide to what building regulations are sets out which work is covered, and our article on when building regulations came into force explains why buyers ask for certificates.
How can you keep building control costs down?
- Submit complete drawings and calculations with a full plans application so the plan check doesn’t stall.
- Put related work into one application where you can, to benefit from reductions on additional fee categories.
- Use competent person scheme installers for electrics, windows and heating.
- Call for inspections at the right stages, such as open foundation trenches and drainage before backfilling, so nothing has to be uncovered later.
- Choose a builder who knows what inspectors expect, and get the responsibility for applications written into your quote.
Frequently asked questions
Do building regulations fees include VAT?
Council charges for plan checking and inspection are subject to VAT, and Colchester’s schedule shows VAT-inclusive totals. Some councils, including Braintree, don’t currently charge VAT on regularisation applications.
Who pays the building control fee, me or the builder?
It depends on your contract. The homeowner, their designer or the builder can submit the application, so make sure your quote says who is responsible for applying and paying.
Are private building control approvers cheaper?
Sometimes. They set their own fees, so get a quote and compare it with your council’s schedule. Only council building control can deal with regularisation applications for work already done.
When do I get a completion certificate?
Under a full plans application, the completion certificate should be issued within eight weeks of the work being finished, as long as it complies.
Want a builder who prices the whole job?
CJC Contracts is a Colchester-based building and groundworks contractor, established in 2007 and based in Great Horkesley, working across Essex and Suffolk. We build extensions and carry out groundworks and drainage. Every project needs a site-specific quote, so request a free quote or call 01206 273689.