CJC CONTRACTS · 13 MILES FROM OUR YARD
Builders in West Mersea
Island homes. Planned around the tides.
CJC Contracts builds extensions, carries out repairs and handles groundworks on Mersea Island, about 13 road miles from our Great Horkesley yard. With one road on and off the island across the Strood, we plan deliveries, skips and concrete pours with the tide tables in mind.
Established 2007 · Domestic & commercial construction

BUILDING ON MERSEA ISLAND
Building on an island with one road in
West Mersea is the main town on Mersea Island, reached by the B1025 over the Strood causeway. Its Neighbourhood Plan describes a causeway that regularly floods and isolates the island, and records that predicted high tides reached the road edge on 369 of the 706 high tides in 2021. For a building project that is a practical matter. Ready-mixed concrete, blocks, steel, skip swaps and the trades’ own journeys all need timing so that nothing is stuck on the wrong side of the water.
Since the Second World War the town has spread along the shoreline east and west of its old centre. The council’s Townscape Character Assessment maps inter-war and post-war streets around Windsor Road and Upland Road, later estates at Firs Hamlet and Whittaker Way, and the maritime quarter around Coast Road, The Hard and the Old City, with its weather-boarded fishermen’s cottages. Bungalows and chalet homes are a distinctive part of the mix, and the Neighbourhood Plan sets out to keep them.
Our nearest published jobs are on the mainland in Colchester: ground beams cast in a deep, narrow excavation next to retained ground at the Hythe, fence rails and supports repaired along an established boundary in Stanway, and reinforced ground beams and slab areas for a new ward on Colchester Hospital’s live site. CJC was set up in 2007, is led by Les Charlesworth with more than 40 years in construction, and carries full insurance. We work for homeowners, businesses and public buildings across the island.
SERVICES
What we build in West Mersea
Extensions
Single and two-storey extensions for island homes, designed with the Neighbourhood Plan in mind. Raising a bungalow or chalet to two storeys faces a policy test on local character, overlooking and light, so we look at single-storey options too.
ExtensionsRenovations
Renovation of bungalows, chalets and older cottages, including layout changes, kitchens and bathrooms, insulation upgrades and new roofs. In the conservation area around Coast Road we work to the materials and details the council approves.
RenovationsNew builds
New homes on island plots, from foundations to finish. Every new dwelling in Colchester’s district pays an Essex Coast RAMS contribution towards protecting coastal habitats, and sites near the shore may need a flood risk assessment.
New buildsGroundworks & drainage
Foundations, drainage and hardstandings on ground that ranges from sand and gravel in the town centre to soft intertidal clays at the creek edges. Trial holes come first, and any soakaway is tested before it goes into the design.
Groundworks & drainageCommercial & concrete
Concrete, drainage and building work for boatyards, shops, caravan parks and public buildings on the island. Local Plan policy for Coast Road favours maritime uses such as boatyards, chandlers and fish businesses, and expects proposals to suit the flood risk.
Commercial & concreteRepairs & maintenance
Repairs and maintenance for island homeowners, landlords, holiday lets and public buildings, including weatherboarding, rainwater goods, render, fencing and boundaries. Published examples on the mainland include fence and boundary repairs in Stanway.
Repairs & maintenanceFROM THE PROJECT ARCHIVE
Our nearest work to West Mersea
Photographs and write-ups from real CJC jobs. These are the closest published projects to West Mersea; more are on our projects page.

The Hythe, Colchester · 8 miles from West Mersea
The Hythe: concrete ground beams
Reinforced concrete ground beams formed in a deep, narrow excavation beside retained ground.
Read the project story
Stanway, Colchester · 8 miles from West Mersea
Stanway: fencing and boundary remedial works
Overgrowth cleared and displaced fence rails and supports repaired along an established boundary.
Read the project story
Colchester · 9 miles from West Mersea
Colchester Hospital: groundworks for a new ward
Reinforced ground beams and large slab areas formed and concreted for a new ward on a live hospital site.
Read the project storyBEFORE YOU BUILD
Building in West Mersea: what to check
The Strood, the tides and site access
The B1025 across the Strood is the only road on and off Mersea Island. The West Mersea Neighbourhood Plan records that predicted high tides came to the road edge on 52 per cent of high tides in 2021, a share it expects to rise to between 71 and 79 per cent by 2060 as sea levels rise, and that blockages last anything from a few minutes to several hours. Colchester’s Level 2 flood risk assessment also warns that the access road can be cut off at high tide. West Mersea and the Strood also have their own Environment Agency flood warning area.
Bungalows, Coast Road and the conservation area
Island planning applications are decided, for now, by Colchester City Council and weighed against the West Mersea Neighbourhood Plan, made in April 2022. Its policy WM 7 resists turning single-storey or one-and-a-half-storey homes into two-storey houses unless there is no harm to local character or to neighbours through overlooking and loss of light. The West Mersea Conservation Area, designated in 1989, takes in the old waterfront along Coast Road, where Local Plan policy SS12b favours maritime uses and supports new homes generally only on upper floors. Council records also list an Article 4 direction for Coast Road.
Sea defences, realignment and flood risk
Earth embankments defend much of Mersea’s shoreline. The Shoreline Management Plan holds the line at West Mersea, and the Local Plan safeguards two island sites where defences are to be realigned in the period 2025 to 2055: the seaward frontage between North Barn and West Mersea, and North Strood Channel. After the December 2013 surge, a sea wall east of West Mersea failed in 2014 and a new counter wall followed. Coast Road also floods at its junction with The Lane, where a portable barrier can be fitted. Development on the coastal frontage must show it could adopt a roll-back approach.
Gravel, clay and estuary silts underfoot
BGS maps put much of the town centre on river terrace sands and gravels over Thames Group clay, with the clay nearer the surface along parts of Coast Road and soft intertidal clays and silts at the Strood and the houseboat creeks. That affects both foundations and drainage: gravels may accept a soakaway once tested to BRE365, while clay and estuarine silts drain poorly. The island’s sewage goes to Anglian Water’s West Mersea water recycling centre, and Anglian Water asks to be told about any building work less than 3 metres from a public sewer.
Checked October 2026 from council, water company and government sources. Rules and services change, so confirm the details for your address with the council before you start.
AREAS COVERED
West Mersea and around
Send us the postcode and we’ll confirm. Places we cover from West Mersea include:
- The Old City
- Firs Hamlet
- East Mersea
- Peldon
- Great Wigborough
- Salcott
- Abberton
- Langenhoe
- Layer de la Haye
- Fingringhoe
- Rowhedge
- Tollesbury
NEARBY AREA PAGES
HOW A PROJECT RUNS
From first call to handover.
- 01
Talk it through
Tell us what you want to build, where it is and what drawings or approvals you already have.
- 02
Visit and price
We look at the site, the access and the ground, then price the work from the drawings and specification.
- 03
Plan the build
We agree the programme, deliveries and any inspections, and who does what where other trades are involved.
- 04
Build and hand over
We run the work through to completion, with building control inspections at the stages the job needs them.
YOUR QUESTIONS
Building in West Mersea: common questions.
Can’t see your question? Call us on 01206 273689.
Do you work on Mersea Island when the Strood floods?
Yes. West Mersea is about 13 miles by road from our Great Horkesley yard, and we cover the whole island and nearby villages such as Peldon and Abberton. Because the Strood can be covered at high tide, we check the tide tables when booking concrete, steel and skip deliveries, and plan arrivals so crews and materials are not held on the mainland.
Can I add a first floor to my bungalow in West Mersea?
Possibly, but it is one of the harder approvals on the island. The Neighbourhood Plan explains that some upward extensions need only the council’s prior approval. Where planning permission is needed, policy WM 7 resists raising single or one-and-a-half-storey homes to two storeys unless you can show no harm to the character of the street or to neighbours through overlooking and loss of light. Speak to the council early.
Is my house in the West Mersea Conservation Area?
If it is on or near the old waterfront along Coast Road, it may be. The conservation area was designated in 1989 and covers part of the island’s maritime quarter, where Local Plan policy expects development to enhance its traditional character. Council records also show an Article 4 direction for Coast Road. Colchester City Council’s interactive map shows the exact boundaries.
What is the ground like for foundations on Mersea?
It varies across short distances. Much of the town sits on sand and gravel over clay, while land by the creeks and the Strood is soft intertidal clay and silt. Trial holes tell us which you have, and your engineer sizes the foundations to suit. A soakaway may work in the gravels if infiltration testing confirms it, but clay and silt drain poorly.
Does a new house on the island need anything extra?
Several things can apply. Every new home in Colchester’s district pays an Essex Coast RAMS contribution towards protecting coastal birds and habitats. Sites in Flood Zones 2 or 3 need a flood risk assessment, and coastal frontage sites must show they could adopt a roll-back approach. The Neighbourhood Plan also covers design and houseboats. We can work with your designer from the start and build to the approved scheme.
START WITH THE BRIEF
Planning work in West Mersea?
Send us the site postcode, a short description of the work and any drawings you have. We’ll come back to you to talk it through and arrange a site visit where it’s needed.
CJC Contracts Ltd · The Mullions, Nayland Road, Great Horkesley, Colchester CO6 4HH
Request a no-obligation quotation
Fields marked * are required.
We’ll use your details to respond to your enquiry.
