How Do You Apply for Planning Permission Without an Architect?
October 21, 2026Planning consent is the formal agreement of a local planning authority that a development can go ahead. In everyday use it means the same as planning permission, which the Designing Buildings wiki describes as the legal approval needed for almost all new developments in the UK. The word “consent” also covers specialist controls such as listed building consent, and “approval” usually means a sign-off on part of a scheme.
This guide sorts out the terms and shows which one you are likely to need. If your project may not need an application at all, see what permitted development is.
Are planning consent and planning permission the same thing?
For most householders, yes. People use “consent”, “permission” and “approval” interchangeably when they mean a council decision that allows building work. The Designing Buildings wiki does not define consent separately but uses it for specialist controls: listed building consent, advertisement consent and consent under tree preservation orders. “Prior approvals” and “approval of conditions” are listed as further types of permission.
What types of consent can you apply for?
The Planning Portal’s online service lists these application types:
- Householder planning consent
- Full planning consent
- Outline planning consent
- Reserved matters
- Listed building consent
- Advertisement consent
- Lawful Development Certificate
- Prior approval
- Removal or variation of conditions
- Approval (discharge) of conditions
- Works to trees
- Non-material amendment of an existing planning permission
- Permission in principle
- Planning permission for relevant demolition in a conservation area
Which one applies depends on your project. A typical homeowner applying for an extension would use householder planning consent.
What is outline planning consent?
Outline permission tests whether the general nature of a development is acceptable before you spend money on detailed designs. The Planning Portal describes it as an application with some or all matters reserved. Reserved matters are the details left for later: appearance, means of access, landscaping, layout and scale. Approval is granted subject to a condition that reserved matters are approved before development begins.
How long does permission last?
Permissions typically expire if work does not start within three years, according to the Designing Buildings wiki. For outline consent, the Planning Portal says a reserved matters application must be made within three years of the consent unless a condition sets a shorter period, and development must start within two years of the latest reserved matters approval. Always read the dates on your decision notice.
What are planning conditions?
Many permissions come with conditions, such as agreeing materials or drainage details before work starts. These need to be dealt with through an approval (discharge) of conditions application before you proceed. Our drainage and groundworks teams often work to conditions like these on site.
How is planning consent different from Building Regulations approval?
They are separate. Planning consent decides whether a development is acceptable in land-use terms, including its appearance and effect on neighbours. Building Regulations approval deals with how the work is constructed. A project can need either or both, so check both early.
Is there a time limit on enforcement if I build without consent?
Yes, but it is long. Government planning guidance says most operational development, meaning building works, becomes immune from enforcement ten years after substantial completion if completed on or after 25 April 2024. Earlier works have a four-year limit. Enforcement can still happen sooner than that, and the council may invite a retrospective application, which does not guarantee approval.
How do I know which consent I need?
Check the Planning Portal’s guides for your project and then ask your local planning authority. If you want a formal answer on whether something needs permission, a Lawful Development Certificate is one of the application types listed.
What is a Lawful Development Certificate?
A Lawful Development Certificate is a formal confirmation from the council that a use or piece of work is lawful. It appears on the Planning Portal’s list of application types. Homeowners who rely on permitted development often apply for one so that they hold written proof for a future sale, rather than relying on their own reading of the rules.
What is prior approval?
Some permitted development rights come with a requirement to ask the council first. A common example is the larger home extension scheme, where a single storey rear extension can go up to six metres, or eight for a detached house, but only with prior approval, according to the Planning Portal. The council then checks specific issues, such as the effect on neighbours, before the work goes ahead. Our extensions team can advise on whether this route suits your plot.
What is listed building consent, and is it different?
Yes. Listed building consent is a separate control from planning permission and applies to works to a listed building. Planning permission may still be needed too, which is why fences, outbuildings and decking near listed buildings often need an application when they would not elsewhere. If your home is listed or borders a listed property, speak to your council before you plan anything.
Who gives consent?
Your local planning authority decides applications, and the Planning Portal passes online applications to the right council. If you disagree with a refusal, a householder appeal must be made within 12 weeks of the decision letter, according to Gov.uk, and most other appeals within six months.
Frequently asked questions
Is planning approval the same as planning permission? Often used the same way, but “approval” may refer to prior approval or approval of conditions, which are separate applications.
Does an outline consent let me start building? No. Reserved matters must be approved before development begins.
Can I change an approved scheme? Small changes can be handled through a non-material amendment, while larger ones may need a new application.
Do I need consent for work on a protected tree? Generally yes. Tree preservation orders require the council’s consent, and trees in conservation areas need six weeks’ notice.
Need a builder once consent is secured?