Planning Application Checklist: Documents to Prepare Before You Submit
October 19, 2026
9 Planning Application Mistakes to Avoid Before Submission
October 20, 2026You need planning permission when your project falls outside permitted development rights, which are national rules in England that allow many home improvements without a full application. Those rights come with size limits and exclusions, and the twelve projects below are the places where people most often cross a line without realising.
For the basics, see our guide to what permitted development is. The figures here come from the Planning Portal’s guidance for houses in England. They do not apply to flats, and some converted houses are excluded. Local rules, called Article 4 Directions, and conditions on an earlier permission can remove these rights, so always check with your local planning authority.
1. Is a fence or wall next to the road permitted development?
Only up to one metre. The Planning Portal says a fence, wall or gate next to a road used by vehicles, or its footpath, must not exceed one metre in height from ground level. Elsewhere the limit is two metres. If an existing boundary is already over these limits you cannot raise it without permission.
2. Does a fence beside a listed building need permission?
Yes. Permission is needed if the site includes a listed building, sits within its curtilage, or if any part of your boundary forms a boundary with a neighbouring listed building or its curtilage.
3. Can I pave my front garden?
Often, but not always. A new or replacement driveway of any size does not need permission if it uses permeable surfacing such as gravel or permeable block paving, or if rainwater drains onto a lawn or border. A traditional impermeable surface covering more than five square metres needs permission unless the water drains to a permeable area. You will also need a dropped kerb to drive over a pavement, which is a separate application to the highway authority. See our paving and external works service.
4. Is there a limit on garden outbuildings?
Yes, several. Outbuildings must be single storey with eaves no higher than 2.5 metres. The maximum overall height is four metres with a dual pitched roof or three metres for any other roof, and 2.5 metres if the building is within two metres of a boundary. Buildings and additions must not cover more than half the land around the original house, and nothing is allowed forward of the wall forming the principal elevation.
5. What about an outbuilding next to a listed building?
Any outbuilding within the curtilage of a listed building needs planning permission. On designated land such as conservation areas, outbuildings at the side of a property also need permission.
6. How far back can a rear extension go?
For a single storey rear extension, the limit is three metres beyond the rear wall of the original house, or four metres for a detached house. A larger home extension scheme allows up to six metres, or eight for detached houses, but only with prior approval, and not on designated land. Maximum height is four metres. Our extensions team can help you plan within these limits.
7. Is a two storey rear extension permitted development?
Only in a narrow set of cases. A rear extension of more than one storey cannot extend more than three metres beyond the rear wall, and it cannot be within seven metres of the boundary opposite the rear wall. On designated land, all rear extensions of more than one storey need householder planning permission.
8. Can I build a side extension without permission?
Only a single storey one. A side extension cannot exceed four metres in height or half the width of the original house. Every side extension of more than one storey needs householder planning permission, and on designated land all side extensions do.
9. Do loft conversions need permission?
Many do not, but the limits are tight. The volume added must not exceed 40 cubic metres for terraced houses or 50 cubic metres otherwise, counting any previous enlargement. It must not extend beyond the existing roof slope on the front elevation facing a highway, must be set back at least 20 centimetres from the original eaves where practicable, and cannot include verandas, balconies or raised platforms. Side windows must be obscure-glazed. See renovations.
10. Is decking always allowed?
No. Decking is permitted development only if it is no more than 30 centimetres above the ground, and together with other extensions and outbuildings it must cover no more than 50 per cent of the garden area. It cannot be in front of the principal elevation, and none is permitted within the curtilage of a listed building.
11. Can I prune or fell a tree in my garden?
Not necessarily. Protected trees generally need the council’s consent before pruning or felling. Trees in conservation areas are also controlled, and you must tell your local planning authority six weeks before starting work. A tree preservation order takes precedence over the conservation area rules.
12. What happens in a conservation area?
Many rights are removed or reduced. The Planning Portal groups conservation areas, National Parks, Areas of Outstanding Natural Beauty, the Broads and World Heritage Sites as designated land, where for example loft conversions and some extensions generally need full permission. If you live in one, assume you need to ask first.
A quick checklist before you build
- Is the property a house rather than a flat or a converted building?
- Is it in a conservation area, or listed, or does a listed building border your plot?
- Has your council removed rights with an Article 4 Direction, or did an earlier permission include conditions?
- Have you measured against the original house, as built or as it stood on 1 July 1948, rather than the house as it stands today?
Frequently asked questions
Who decides whether I need permission? Your local planning authority. If you want certainty, you can apply for a Lawful Development Certificate, which is one of the consent types listed on the Planning Portal.
What happens if I build without permission? The council can take enforcement action. Under government guidance, most building works become immune from enforcement ten years after substantial completion for works finished on or after 25 April 2024, and four years for earlier works.
Do I need Building Regulations even if I do not need planning permission? They are separate systems, so a project can need one without the other.
Where do I check the rules for my own project? The Planning Portal publishes guides for over 60 home improvements.